# US 12,118,631 B1 · Project cost system and method for a precise automated construction

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 12,118,631 B1
- Document ID: US12118631B1
- Status: Granted
- Kind: B1
- Application number: 17/508,277
- Filed: 2021-10-22
- Granted: 2024-10-15
- Earliest claimed: 2020-10-22
- Applicants: Richard A. Krause
- Inventors: Richard A. Krause
- Web page: https://patentgrep.com/patent/US12118631B1

## CPC

- G06Q 50/08: Construction
- G06F 9/541: {via adapters, e.g. between incompatible applications}
- G06F 9/547: {Remote procedure calls [RPC]; Web services}
- G06F 16/258: {Data format conversion from or to a database}
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 30/0611: {Request for offers or quotes}
- G06Q 40/12: Accounting
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A project cost module-based system according to the present invention gathers and summarizes the total cost of the project and organizes it into a detailed line-item format. The project cost module-based system matches up and confirms the quantity and types of all required materials, labor, and equipment. This project cost module-based system has the ability to understand the electronic design and basic schedule duration constraint data that is fed into it and knows, item by item, how to pinpoint required materials or equipment. This is done with its own built-in intelligence that is generated from a combination of historic data, basic logic, learned adjustments, barcoding, and other identification methods. Then, preferably by way of its own built-in intelligence/database or alternatively by way of other market databases, the project cost module-based system solicits pricing for that material.

## Claims

### Claim 1

A project cost-estimating system for an automated construction, the project cost-estimating system comprising, in combination:
a plurality of networked computers being in communication with one another and being configured to implement a plurality of non-transitory, computer-implementable, software-based components allowing directional inter-component communication therebetween and that comprises;
a centralized project cost information conversion and management software component configured to:
receive digital project design data for a project design from at least one upstream software component source;
analyze the digital project design data for errors to properly enable and competently support downstream automation processes to competently support a complete construction of the project design in an automated manner;
provide a mechanism for correcting or alerting a user to the errors for ensuring the digital project design data competently supports the project design and complete construction thereof;
convert the digital project design data into a standardized data format that enables peripheral software components in networked, inter-component communication with the centralized project cost information conversion and management software component to perform automated peripheral software component functions;
code and quantify every component of the project design organizing coded and quantified components into a line-item cost accounting medium; and
send the digital project design data as converted to the standardized data format to at least downstream software component for enabling and competently supporting completion of the project design and construction thereof in an automated manner.

### Claim 2 (depends on 1)

The project cost-estimating system of claim 1 wherein the at least one upstream software component source comprises a plurality of data input software components, the plurality of data input software components comprising an electronic project design data software component, a basic schedule duration constraints software component, and a site evaluation and existing conditions software component.

### Claim 3 (depends on 2)

The project cost-estimating system of claim 2 wherein the centralized project cost information conversion and management software component is in inter-component communication with the plurality of data input software components and configured to receive the digital project design data for the project design and wherein the at least one downstream software component is in inter-component communication with the centralized project cost information conversion and management software component.

### Claim 4 (depends on 1)

The project cost-estimating system of claim 1 wherein the line-item cost accounting medium is configured to track every component of the project design thereby allowing each component to be costed, contracted, procured, tracked, and delivered to a jobsite as required.

### Claim 5 (depends on 1)

The project cost-estimating system of claim 1 comprising a line-item quantities integration software component, a review and adjust schedule and sequence of work software component, and an establish project control points and GPS software component, the line-item quantities integration software component, the review and adjust schedule and sequence of work software component, and the establish project control points and GPS software component together being operable to formulate a basis in which a comprehensive cost estimate can be developed.

### Claim 6 (depends on 5)

The project cost-estimating system of claim 5 wherein the line-item quantities integration software component, the review and adjust schedule and sequence of work software component, and the establish project control points and GPS software component are each in inter-component unidirectional downflow communication with the centralized project cost information conversion and management software component.

### Claim 7 (depends on 6)

The project cost-estimating system of claim 6 wherein a labor, production, wages and equipment needs software component is in inter-component communication with the line-item quantities integration software component and the establish project control points and GPS software component and the review and adjust schedule and sequence of work software component is in inter-component communication with the labor, production, wages and equipment needs software component.

### Claim 8 (depends on 7)

The project cost-estimating system of claim 7 wherein a send bid documents software component is in inter-component communication with the line-item quantities integration software component, the review and adjust schedule and sequence of work software component, and the establish project control points and GPS software component.

### Claim 9 (depends on 8)

The project cost-estimating system of claim 8 wherein an invite to subcontractors, supplier software component is in inter-component communication with the review and adjust schedule and sequence of work software component and the line-item quantities integration software component.

### Claim 10 (depends on 9)

The project cost-estimating system of claim 9 wherein a final bid submission by vendors software component is in inter-component with the send bid documents software component and the invite to subcontractors-suppliers software component, and the labor, production, wages and equipment needs software component is in inter-component with the final bid submission by vendors software component.

### Claim 11 (depends on 10)

The project cost-estimating system of claim 10 wherein an evaluate bids and delivery software component is in inter-component with the final bid submission by vendors software component and the labor, production, wages and equipment needs software component.

### Claim 12

A project cost-estimating system operable within a computer network environment, the computer network environment being configured to implement a series of non-transitory, computer-implementable, software-based components allowing directional inter-component communication therebetween, the project cost-estimating system comprising:
a centralized project cost information design input conversion and management software component and at least one computer for implementing the centralized design input conversion and management software component configured to:
receive digital project design data from at least one upstream software component source;
analyze the digital project design data for errors to properly enable and competently support downstream automation processes to competently support construction of a project design in an automated manner;
provide a mechanism for correcting or alerting a user to the errors for ensuring the digital project design data competently supports construction of the project design;
convert the digital project design data into a standardized format that enables peripheral software components in networked, inter-component communication with the centralized project cost information conversion and management software component to perform automated peripheral software component functions;
code and quantify every component of the project design organizing coded and quantified components into a line-item cost accounting medium; and
send the digital project design data as converted to the standardized data format to at least downstream software component for enabling and competently supporting completion of the project design and construction thereof in an automated manner.

### Claim 13 (depends on 12)

The project cost-estimating system of claim 12 wherein the at least one upstream software component source comprises a series of data input software module components, the series of data input software module components comprising an electronic project design data software component, a basic schedule duration constraints software component, and a site evaluation and existing conditions software component.

### Claim 14 (depends on 12)

The project cost-estimating system of claim 12 wherein the line-item cost accounting medium is configured to track every component of the project design thereby allowing each component to be costed, contracted, procured, tracked, and delivered to a jobsite as required.

### Claim 15 (depends on 12)

The project cost-estimating system of claim 12 comprising a line-item quantities integration software component, a review and adjust schedule and sequence of work software component, and an establish project control points and GPS software component, the line-item quantities integration software component, the review and adjust schedule and sequence of work software component, and the establish project control points and GPS software component together being operable to formulate a basis in which a comprehensive cost estimate can be developed.

### Claim 16 (depends on 15)

The project cost-estimating system of claim 15 wherein a labor, production, wages and equipment needs software component is in inter-component communication with the line-item quantities integration software component and the establish project control points and GPS software component and the review and adjust schedule and sequence of work software component is in inter-component communication with the labor, production, wages and equipment needs software component.

### Claim 17 (depends on 16)

The project cost-estimating system of claim 16 wherein a send bid documents software component is in inter-component communication with the line-item quantities integration software component, the review and adjust schedule and sequence of work software component, and the establish project control points and GPS software component.

### Claim 18 (depends on 17)

The project cost-estimating system of claim 17 wherein an invite to subcontractors, supplier software component is in inter-component communication with the review and adjust schedule and sequence of work software component and the line-item quantities integration software component.

### Claim 19 (depends on 18)

The project cost-estimating system of claim 18 wherein a final bid submission by vendors software component is in inter-component communication with the send bid documents software component and the invite to subcontractors-suppliers software component, and the labor, production, wages and equipment needs software component is in inter-component communication with the final bid submission by vendors software component.

### Claim 20 (depends on 19)

The project cost-estimating system of claim 19 wherein an evaluate bids and delivery software component is in inter-component communication with the final bid submission by vendors software component and the labor, production, wages and equipment needs software component.