Subsea foundation
AssigneeEquinor Energy AS
InventorsKjell Einar Ellingsen, Jone Stangeland, Geir Gundersen Fuhr, Lorents Reinås, Morten Æther, Harald Sigurd Nesse, Asle Eide
Life of this patent
Estimating the term…
Loading patent…
AssigneeEquinor Energy AS
InventorsKjell Einar Ellingsen, Jone Stangeland, Geir Gundersen Fuhr, Lorents Reinås, Morten Æther, Harald Sigurd Nesse, Asle Eide
Estimating the term…
A subsea foundation system and a method of connecting a lower pipe portion to a subsea foundation are provided. The method includes: providing the subsea foundation, an upper pipe portion being connected to the subsea foundation, deploying the subsea foundation subsea; and connecting the lower pipe portion to the upper pipe portion. The subsea foundation system includes: the subsea foundation; the upper pipe portion connected to the subsea foundation, and the lower pipe portion. The lower pipe portion can be connected to the upper pipe portion subsea. The lower pipe portion may be connected to the subsea foundation in a stowed position before deployment subsea. The lower pipe portion may be connected to a pull-in arrangement before deployment subsea.
A method of connecting a lower pipe portion to a subsea foundation, the method comprising:
A subsea foundation system for deployment subsea, the subsea foundation system comprising:
Dependencies are inferred from the claim text.