Method for allocating electrical power to crane equipment
AssigneeManitowoc Crane Group France SAS
InventorsBruno Roni-Damond, Vincent Veillerot
Life of this patent
Estimating the term…
Loading patent…
AssigneeManitowoc Crane Group France SAS
InventorsBruno Roni-Damond, Vincent Veillerot
Estimating the term…
An allocation method for allocating an available maximum power from at least one power supply source to electrical equipment of a crane, in which the electrical equipment are powered with the available maximum power, includes selecting between: a raw mode in which the available maximum power is allocated over predefined actuation equipment and on accessory equipment predefined among the electrical equipment, the actuation equipment being defined according to a configuration of the crane, and an optimized mode in which the available maximum power is allocated over the predefined actuation equipment, and also over the accessory equipment but according to the cut-off conditions of the accessory equipment, so that according to the cut-off conditions the actuation equipment are powered or not.
A crane comprising electrical equipment intended to be electrically powered from at least one power supply source capable of providing an available maximum power which corresponds to a maximum power that can be delivered by the at least one power supply source, said electrical equipment comprising actuation equipment defined according to a configuration of the crane and accessory equipment, wherein said crane comprises a control/command unit configured for the implementation of an allocation method for allocating the available maximum power from the at least one power supply source to the electrical equipment of a crane, wherein said allocation method being implemented by said control/command unit comprises a step of selecting between:
Dependencies are inferred from the claim text.