Method and system for estimating the drift of a clock for dating seismic data samples
AssigneeSercel
InventorChristophe L'Her
Life of this patent
Estimating the term…
Abstract
The method for estimating the drift over time of a physical operating parameter of a clock for dating seismic data samples associated with a seismic data collection node involves measuring (10) at least one quantity associated with the clock, at predetermined instants or during predetermined time periods, and applying (12), to this quantity, a predetermined non-linear law of variation of this quantity that depends on the values collected during the measurement step (10), so as to obtain an estimation of the drift over time of the physical operating parameter.
Claims15
A method for estimating a drift over time of a variable physical operating parameter of a clock for dating samples of seismic data, associated with a seismic data collection node, said method comprising the steps of:
- inserting a clock into a seismic data collection node that assigns a date to a seismic data, relating to at least one seismic event, collected by said seismic data collection node;
- at least one variable physical operating parameter associated with said clock is measured in a measurement step, at predetermined instants in time or for predetermined periods of time;
- and
- a predetermined non-linear law of variation of said variable physical operating parameter, which depends on values of said at least one variable physical operating parameter collected in said measurement step, is applied to said variable physical operating parameter so as to obtain an estimate of said drift over time of said variable physical operating parameter,
- and wherein, in said measurement step:
- before deploying said seismic data collection node for a seismic data collection mission, an initial instantaneous frequency of said clock is measured, and an internal time information signal of said node is synchronized with respect to a reference time information signal;
- at a predetermined instant in time during said seismic data collection mission, a final instantaneous frequency of said clock and a phase offset between said internal time information signal of said seismic data collection node and said reference time information signal are measured;
- and wherein, in said step of applying said predetermined non-linear law of variation of said variable physical operating parameter, an instantaneous frequency error of said clock is estimated based on said initial instantaneous frequency, said instantaneous frequency at said predetermined instant in time and said phase offset,
- and wherein, according to said predetermined non-linear law of variation of said variable physical operating parameter, said instantaneous frequency varies according to a polynomial equation of order greater than or equal to 2, such that a phase of said clock varies according to a polynomial equation of order greater than or equal to 3.
A method for estimating a drift over time of a variable physical operating parameter of a clock for dating samples of seismic data, associated with a seismic data collection node, said method comprising the steps of:
- inserting a clock into a seismic data collection node that assigns a date to a seismic data, relating to at least one seismic event, collected by said seismic data collection node;
- at least one variable physical operating parameter associated with said clock is measured in a measurement step at predetermined instants in time or for predetermined periods of time;
- and
- a predetermined non-linear law of variation of said physical operating parameter variable, which depends on values of said at least one variable physical operating parameter collected in said measurement step, is applied to said variable physical operating parameter so as to obtain an estimate of said drift over time of said variable physical operating parameter,
- and wherein, in said measurement step, a phase of said clock is measured for a first predetermined period of time before deploying said node for a seismic data collection mission and for a second predetermined period of time at an end of said seismic data collection mission and, in said step of applying said law, an interpolation method is used so as to obtain an estimate of an accumulated phase error of said clock, and wherein, according to said predetermined non-linear law of variation of said variable physical operating parameter, a phase of said clock varies according to a polynomial equation of order greater than or equal to 3.
Dependencies are inferred from the claim text.