A method for the construction of composite under-reamed pile, including: implementing a jet grouting and agitation at a pre-designed position to form a composite cemented-soil foundation; constructing the pile hole with a drilling rig, during which bulb cavities are formed when the pile structure includes bulbs; cleaning the pile hole, lifting down a reinforcing cage, lowering a concrete pouring conduit to the pile hole, and lifting the pouring conduit while pouring the concrete; the hardened concrete becoming a pile stem in the pile hole and a bulb in the bulb cavity. Thus, this construction method can completely eliminate the hole collapse risk at the bulb cavity position during drilling; the combined structure of the bulb and the composite cemented-soil foundation can greatly improve the bearing capacity of pile foundation, significantly reduce the settlement risk and the cost of the pile foundation, as well as shorten construction period.
A method for constructing a composite under-reamed pile, the method comprising:
Dependencies are inferred from the claim text.