Electroslag strip cladding
AssigneeEsab AB
InventorTamás Sándor
Life of this patent
Estimating the term…
Abstract
A method and system for electroslag strip cladding (ESSC) of rail heads without preheating utilizing twin electroslag strip welding techniques. The twin ESSC techniques include depositing a layer of wear and corrosion resistance cladding material onto the entire running surface of the rail head at a relatively fast welding speed of approximately sixty cm/minute with less than one cm/meter of distortion. The welding speed is achieved by moving a twin ESSC welding head along a rail, with the running surface of the rail head facing upward, or advancing a rail through a space under the twin ESSC welding head, with the running surface of the rail head facing upward, while cladding material is deposited continuously onto the running surface of the rail head.
Claims19
A method of cladding a rail, comprising:
- providing a rail including a rail head portion having a region defining a running surface;
- aligning an electroslag strip cladding (ESSC) welding head having twin strips of cladding material above the rail head portion, wherein the twin strips define a first strip of cladding material and a second strip of cladding material;
- guiding the first strip and the second strip towards the rail head portion;
- transferring a current to at least one of the first strip and the second strip to create a molten slag pool on the rail head portion sufficient for initiation of a cladding phase;
- and
- advancing the ESSC welding head at a predetermined travel speed of progression along the rail head portion during the cladding phase to deposit a cladding layer comprised of the first strip and the second strip across the region defining the running surface of the rail head portion,
- wherein the advancing further comprises depositing the cladding layer across the region defining the running surface of the rail head portion without preheating the rail.
A method of cladding a rail, comprising:
- providing a rail including a rail head portion having a region defining a running surface;
- aligning the region of the rail head portion defining the running surface with an electroslag strip cladding (ESSC) welding head having twin strips of cladding material, wherein the twin strips define a first strip of cladding material and a second strip of cladding material;
- guiding the first strip and the second strip towards the rail head portion;
- transferring a current to at least one of the first strip and the second strip to create a molten slag pool on the rail head portion sufficient for initiation of a cladding phase;
- and
- advancing the rail under the ESSC welding head at a predetermined travel speed of progression during the cladding phase to deposit a cladding layer comprised of the first strip and the second strip across the region defining the running surface of the rail head portion,
- wherein the advancing further comprises depositing the cladding layer across the region defining the running surface of the rail head portion without preheating the rail.
A system for cladding a rail including a rail head portion having a region defining a running surface, comprising:
- an electroslag strip cladding (ESSC) welding head including:
- a first strip feeder configured to guide a first strip of cladding material towards the rail head portion;
- a second strip feeder configured to guide a second strip of cladding material towards the rail head portion;
- a power source configured to transfer a current to at least one of the first strip and the second strip to create a molten slag pool on the rail head portion sufficient for initiation of a cladding phase;
- and
- a transfer apparatus configured to:
- advance the ESSC welding head at a first predetermined speed of progression over the rail head portion of the rail during the cladding phase to deposit a molten cladding layer comprised of the first strip and the second strip across the region defining the running surface;
- advance the rail head portion of the rail at a second predetermined speed of progression through a space under the ESSC welding head during the cladding phase to deposit the molten cladding layer comprised of the first strip and the second strip across the region defining the running surface;
- or
- advance the ESSC welding head at a third predetermined speed of progression over the rail head portion of the rail while also advancing the rail head portion of the rail at a fourth predetermined speed of progression through the space under the ESSC welding head during the cladding phase to deposit the molten cladding layer comprised of the first strip and the second strip across the region defining the running surface,
- wherein the transfer apparatus advances the ESSC welding head over the rail head portion of the rail and/or the rail head portion of the rail through the space under the ESSC welding head without the rail being preheated prior to depositing the molten cladding layer across the region defining the running surface of the rail.
Dependencies are inferred from the claim text.