Solute concentration decision method and water quality management method for steam turbine plant
AssigneeMitsubishi Heavy Industries, Ltd.
InventorsAkihiro Hamasaki, Haruka Kido, Mitsuru Nakamoto, Senichi Tsubakizaki
Life of this patent
Estimating the term…
Abstract
A solute concentration decision method for deciding a planned value CI of a concentration of a solute in a solution to be supplied to a first drum among one or more steam drums for temporarily containing steam generated in a boiler of a steam turbine plant includes a step of deciding the planned value CI of the concentration of the solute in the solution to be supplied to the first drum, on the basis of a target concentration of the solute in the solution in the first drum and a capacity coefficient of the solute in a drum unit including the first drum and an evaporator for generating steam contained in the first drum.
Claims10
A solute concentration decision method for deciding a planned value CI of a concentration of a solute in a solution to be supplied to a first drum among one or more steam drums for temporarily containing steam generated in a boiler of a steam turbine plant, the method comprising
- a step of deciding the planned value CI of the concentration of the solute in the solution to be supplied to the first drum, on the basis of a target concentration of the solute in the solution in the first drum and a capacity coefficient of the solute in a drum unit including the first drum and an evaporator for generating steam contained in the first drum.
A solute concentration decision method for deciding a planned value CI of a concentration of a solute in a solution to be supplied to a first drum among one or more steam drums for temporarily containing steam generated in a boiler of a steam turbine plant, the method comprising:
- a step of setting a target concentration of the solute in the solution of the first drum;
- a step of obtaining a capacity coefficient of a drum unit including the first drum and an evaporator for generating steam contained in the first drum, on the basis of a specification of the steam turbine plant;
- and
- a step of deciding the planned value CI of the concentration of the solute in the solution to be supplied to the first drum, on the basis of the target concentration and the capacity coefficient.