Providing auxiliary power using offshore wind turbines
AssigneeVestas Wind Systems A/S
InventorTusitha Abeyasekera
Life of this patent
Estimating the term…
Loading patent…
AssigneeVestas Wind Systems A/S
InventorTusitha Abeyasekera
Estimating the term…
Embodiments herein describe operating wind turbines in an offshore park to provide auxiliary power to a local AC grid or to an onshore grid during a grid malfunction. In one embodiment, the offshore park is coupled via a HVDC link to an onshore grid. When the HVDC link is down, a substation in the park includes a backup generator for creating a weak grid for powering auxiliary systems in a pilot turbine. The wind turbines in the park can switch to an auxiliary control system help power the auxiliary systems in the substation and in other turbines. In another embodiment, the offshore park is AC coupled to an onshore grid using a transformer in the substation. The wind turbines can participate in a brown or black start following a grid fault by switching to operating using the auxiliary control system.
A method for controlling a renewable power plant, the renewable power plant comprising a wind turbine park comprising a plurality of wind turbines connected to a local grid and to a substation having a backup generator and an AC/DC converter, wherein a high-voltage DC (HVDC) link connects the renewable power plant to a second grid via the AC/DC converter, the method comprising, upon determination that the HVDC link is unavailable:
A method for controlling a power network, the power network comprising an offshore wind turbine park comprising a plurality of offshore wind turbines connected to an offshore local grid and an onshore wind turbine park comprising a plurality of onshore wind turbines connected to an onshore grid, the onshore and offshore parks being connected by an AC link, the method comprising, upon determination that a fault has occurred in the power network:
A method for controlling a power network, the power network comprising an offshore wind turbine park comprising a plurality of offshore wind turbines connected to an offshore local grid and an onshore wind turbine park comprising a plurality of onshore wind turbines connected to an onshore grid, the onshore and offshore parks being connected by an AC link, the method comprising, upon determination that a fault has occurred in the power network:
Dependencies are inferred from the claim text.