# US 12,006,650 B2 · Pile pouring structure based on informatization technology and pile structure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 12,006,650 B2
- Document ID: US12006650B2
- Status: Granted
- Kind: B2
- Application number: 17/594,797
- Filed: 2021-03-18
- Published: 2022-09-29
- Granted: 2024-06-11
- Earliest claimed: 2020-09-09
- Assignees: China Mcc5 Group Corp. Ltd
- Applicants: China Mcc5 Group Corp.Ltd
- Inventors: Genming Yang; Liming Deng; Xingguo Liao
- Web page: https://patentgrep.com/patent/US12006650B2

## CPC

- E02D 5/34: Concrete or concrete-like piles cast in position {; Apparatus for making same (E02D5/50 takes precedence; moulds E02D5/665; placing, removing moulds E02D7/00 - E02D11/00; placing the concrete E02D15/04)}
- E02D 9/00: Removing sheet piles bulkheads, piles, mould-pipes or other moulds {or parts thereof}(for both placing and removing E02D11/00)
- G06K 17/00: Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06Q 50/08: Construction
- E02D 2250/0023: Cast, i.e. in situ or in a mold or other formwork
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- G06K: GRAPHICAL DATA READING (image or video recognition or understanding G06V); PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A pile pouring structure includes a steel reinforcement cage, a limiting ring arranged on the outer side of the steel reinforcement cage, a plurality of PVC pipes arranged in the steel reinforcement cage, a cut-off layer arranged on the limiting ring, a two-dimensional code display board arranged in one-to-one correspondence with the steel reinforcement cage, the cut-off layer is annular. The two-dimensional code display board is provided with a two-dimensional code which is scanned to enter an information input interface. Information management is achieved in the pile construction process by scanning the two-dimensional code for inputting pile body strength information, thereby improving the work efficiency. The cut-off layer is used as an interface between a pile body and a pile head so that a part needing to be broken is rapidly positioned. The pile head at a part above the cut-off layer is broken so that the cut-off layer is capable of protecting a lower structure.

## Claims

### Claim 1

A pile pouring structure based on informatization technology, comprising a steel reinforcement cage (9), a limiting ring (3) arranged on an outer side of the steel reinforcement cage, a plurality of PVC pipes (6) arranged in the steel reinforcement cage, a cut-off layer (5) arranged on the limiting ring (3), a two-dimensional code display board (7) corresponding to the steel reinforcement cage (9), a steel pipe (8) disposed across the steel reinforcement cage (8) at a location above the cut-off layer (5) in a traverse direction relative to a direction of the plurality of PVC pipes (6),
wherein the cut-off layer (5) is annular in shape and is made of PVC, the plurality of PVC pipes (6) extends through the cut-off layer (5), and the two-dimensional code display board displays a two-dimensional code that provides an information input interface when scanned.

### Claim 2 (depends on 1)

The pile pouring structure based on informatization technology according to claim 1, wherein the cut-off layer (5) and the limiting ring (3) are connected using a fastener (4).

### Claim 3 (depends on 2)

The pile pouring structure based on informatization technology according to claim 2, wherein the limiting ring (3) is a steel ring.

### Claim 4 (depends on 1)

The pile pouring structure based on informatization technology according to claim 1, wherein the steel pipe (8) is sealed using two sealing plugs.