Construction method for reinforcing and repairing steel pipe pile for offshore wind power
AssigneeZhejiang University
InventorRonghua Zhu
Life of this patent
Estimating the term…
Loading patent…
AssigneeZhejiang University
InventorRonghua Zhu
Estimating the term…
A construction method for reinforcing and repairing a steel pipe pile for offshore wind power includes the following steps. Installing multiple support ribs on an outer wall of a steel pipe pile to be repaired along a circumferential direction. Placing multiple support plate components on the support ribs and performing splicing along the outer wall of the steel pipe pile to form an annular support plate assembly. Installing multiple hoop cylinder components on the support plate assembly, performing splicing along the outer wall of the steel pipe pile to form an annular hoop cylinder assembly, and forming a grouting cavity between the hoop cylinder assembly and the steel pipe pile. Connecting grouting pipelines to grouting ports of the hoop cylinder assembly, and performing a grouting operation. After grouting, forming a reinforcement and repair structure on the outer wall of the steel pipe pile when grouting materials are solidified.
A construction method for reinforcing and repairing a steel pipe pile for offshore wind power, the construction method comprising the following steps:
Dependencies are inferred from the claim text.