Coordination of protective elements in an electric power system
AssigneeSchweitzer Engineering Laboratories, Inc.
InventorsJai Ganesh Subbarayan, Jeremy William Blair, Brett Mitchell Cockerham
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchweitzer Engineering Laboratories, Inc.
InventorsJai Ganesh Subbarayan, Jeremy William Blair, Brett Mitchell Cockerham
Estimating the term…
The present disclosure relates to systems and methods to coordinate protective elements in an electric power system (EPS). In one embodiment, a system may include a Time vs Normalized Impedance Length subsystem to determine a first plurality of times of operation of a first protective element for a plurality of fault locations in the EPS and to determine a second plurality of times of operation of a second protective element for the plurality of fault locations in the EPS. A protective action subsystem may coordinate a response of the first protective element and the second protective element. The protective action subsystem may establish a pickup and a protective action for the second protective element. Upon detection of a fault in the EPS, one of the first protective action and the second protective action may be implemented based on one of the first pickup and the second pickup.
A system to coordinate protective elements in an electric power system (EPS), comprising:
A method for coordinating protective elements in an electric power system (EPS), the method comprising:
Dependencies are inferred from the claim text.