A system comprising a plurality of devices which each have at least one consumer of electricity as well as a controller, wherein the devices are networked and configured to automatically generate proposals for an altered sequence planning in order to enable peak electricity values that are as low as possible, and having an allocation module in which a maximum power value for consumers of the plurality of devices is stored, wherein there is a communications link between the controllers of the plurality of devices and the allocation module via which the controllers of the plurality of devices send information about planned and current processes and receive an enabling signal, wherein the planned and current processes are allocated to one of several categories of priority, wherein, when there are so many pending cooking processes within the same category of priority that the predefined maximum power value would be exceeded with them, a next target completion time is used for prioritization, wherein the system comprises a database in which power data for the planned and current processes are stored, wherein the power data comprise typical energy consumption of said consumers over the course of a day, wherein the allocation module is configured to access the database.