Systems and methods for scheduling track maintenance
AssigneeBNSF Railway Company
InventorsMitchel Jeffrey-Roy Smith, Daniel Phillip Clark, Karl Lewin, Jose Gerardo Garza, Christopher Jason Thompson
Life of this patent
Estimating the term…
Loading patent…
AssigneeBNSF Railway Company
InventorsMitchel Jeffrey-Roy Smith, Daniel Phillip Clark, Karl Lewin, Jose Gerardo Garza, Christopher Jason Thompson
Estimating the term…
In one embodiment, a method includes generating a first visual representation of a location of a railroad station in relation to a railroad track, receiving a request for a first maintenance window, and determining that the first maintenance window is associated with the railroad station. The method further includes determining a first time period and generating a second visual representation of information associated with the railroad station during the first time period. The information includes an indication of a time that a train is scheduled to cross the railroad station during the time period. The information also includes an indication of a time duration for a second maintenance window that has been requested during the time period.
A method, comprising:
A system comprising one or more processors and a memory storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
One or more non-transitory computer-readable storage media embodying instructions that, when executed by a processor, cause the processor to perform operations comprising:
Dependencies are inferred from the claim text.