Scheduling method and system for fully autonomous waterborne inter terminal transportation
AssigneeZhejiang University
InventorsHuarong Zheng, Wen Xu, Dongfang Ma, Fengzhong Qu
Life of this patent
Estimating the term…
Loading patent…
AssigneeZhejiang University
InventorsHuarong Zheng, Wen Xu, Dongfang Ma, Fengzhong Qu
Estimating the term…
The present application discloses is a scheduling method and system for fully autonomous waterborne inter terminal transportation, and belongs to the field of transportation. The method includes: establishing a dynamic scheduling model for waterborne Autonomous guided vessels (wAGVs); quickly inserting the dynamically arriving transportation tasks into all the existing wAGV paths, calculating the insertion cost and selecting the path and position with the lowest insertion cost to obtain updated initial paths; improving the initial path using a heuristic algorithm based on tabu search to obtain quasi-optimal wAGV paths; executing the scheduling wAGV paths.
A scheduling method for fully autonomous waterborne inter terminal transportation, applied in an autonomous waterborne transportation system for dynamic scheduling of waterborne autonomous guided vessels (wAGV), comprising the following steps:
A system for fully autonomous waterborne inter terminal transportation scheduling, comprising a waterborne autonomous guided vessel (wAGV) system, an initial path solving module of a dynamic scheduling model, an initial path construction module, a real-time optimization module and a scheduling module;
Dependencies are inferred from the claim text.