Automated precise constant pressure fracturing with electric pumps
AssigneeHalliburton Energy Services, Inc.
InventorsMadhur Kohli, Alexander Simon Chretien, Vladimir Nikolayevich Martysevich
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsMadhur Kohli, Alexander Simon Chretien, Vladimir Nikolayevich Martysevich
Estimating the term…
A method of controlling a pumping stage of a fracturing fleet at a wellsite with a set of electric frac pumps to deliver fracturing fluids into a target formation at a steady pressure value. An global control process on a computer system communicatively connected to the plurality of pumping units can communicate a unit setpoint to each pumping unit, monitor the sensor measurements, compare the periodic datasets to a target pressure, and modify the fluid output of the pump units to achieve the target pressure during the pumping operation. The global control process can direct at least one pumping unit to deliver a fracturing treatment at a pressure higher or lower than the target pressure in response to changing wellbore environment pressures.
A method of modifying a pumping stage of a pumping operation of a fracturing fleet at a wellsite, comprising:
A method of controlling a pumping sequence of a fracturing fleet at a wellsite, comprising:
A fracturing fleet system at a wellsite, comprising:
Dependencies are inferred from the claim text.