Central plant with secondary strong prevention
AssigneeJohnson Controls Tyco IP Holdings LLP
InventorsJared Fread, Ryan C. Beaty, Shawn A. Schlagenhaft, Graeme Willmott
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Tyco IP Holdings LLP
InventorsJared Fread, Ryan C. Beaty, Shawn A. Schlagenhaft, Graeme Willmott
Estimating the term…
A central plant includes a plurality of subplants including a chiller configured to output supply water at a supply water temperature, a sensor configured obtain a measurement of the supply water temperature, and a control system. The control system is configured to calculate an additional load factor based on the measurement of the supply water temperature and a supply water temperature setpoint, obtain an actual load for the chiller, calculate an effective load based on the additional load factor and the actual load, generate load allocations for the plurality of subplants based on the effective load, and control the plurality of subplants to operate in accordance with the load allocations.
A central plant, comprising:
A method for controlling building equipment comprising a chiller, the method comprising:
A method for controlling a central plant, comprising:
Dependencies are inferred from the claim text.