Method for controlling a wind power installation or a wind farm
AssigneeWobben Properties GmbH
InventorJohannes Brombach
Life of this patent
Estimating the term…
Abstract
A control system of a wind power installation and/or a wind farm is provided. The control system has a plurality of operating modes and has an interface. The interface is configured for providing maximum adjustability of the wind power installation and/or the wind farm in critical power grid situations. The interface is configured to receive a signal of a power grid operator, as a result of which all of the plurality of operating modes are released and made available to the power grid operator.
Claims17
A control system of a wind power installation or a wind farm, comprising:
- a first interface configured to receive a first signal from a power grid operator,
- wherein:
- the control system has a plurality of operating modes for controlling the wind power installation or the wind farm,
- the control system is configured to enable adjustment of the wind power installation or the wind farm in critical power grid situations, and
- the control system is configured to, in response to receiving the first signal, release all of the plurality of operating modes of the control system and make all of the plurality of operating modes available to the power grid operator.
A control system of a wind power installation or a wind farm, comprising:
- a first interface configured to receive a first signal from a power grid operator,
- wherein:
- the control system is configured to enable adjustment of the wind power installation or the wind farm in critical power grid situations,
- the control system is configured to, in response to receiving the first signal, release a plurality of operating modes of the control system and make the plurality of operating modes available to the power grid operator, and
- the control system has at least one operating mode that is activated and is only capable of being deactivated by the power grid operator over the first interface.
A method for controlling a wind power installation or a wind farm, comprising:
- receiving, by a control system of the wind power installation or the wind farm, a first signal;
- wherein the control system has a plurality of operating modes for controlling the wind power installation or the wind farm,
- determining whether the first signal is from a power grid operator and releasing and making available to the power grid operator all of the plurality of operating modes of the wind power installation or the windfarm;
- and
- in response to determining that the first signal is from the power grid operator and releasing and making available to the power grid operator all of the plurality of operating modes of the wind power installation or the windfarm, releasing all of the plurality of operating modes of the wind power installation or the windfarm to the power grid operator.
Dependencies are inferred from the claim text.