Wind energy installation and a method of operating a wind energy installation
AssigneeSiemens Gamesa Renewable Energy Service GmbH
InventorsOliver Hör, Stefan Behl, Karsten Warfen
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Gamesa Renewable Energy Service GmbH
InventorsOliver Hör, Stefan Behl, Karsten Warfen
Estimating the term…
A method of operating a wind energy installation wherein a rotor has a first rotor blade which can be angularly adjusted, a first adjustment drive for adjusting the rotor blade, and a safety control system. In a normal mode of operation, the first adjustment drive is supplied with energy from a source and is controlled by a first pitch control system. In a failure mode of operation, the supply of energy to the first adjustment drive is switched from the source to an energy storage device and the safety control system monitors a position and/or movement of the first rotor blade. The first rotor blade is adjusted by the first adjustment drive in a direction of a predetermined stopping position, while the safety control system, as a function of the monitored position and/or movement, enables or effects a deactivation of a first power supply shut-off device. In the failure mode of operation, the safety control system, as a function of the monitored position and/or movement, closes a first pitch brake and activates a first blocking mode in which the supply of energy to the first adjustment drive from the energy storage device and/or an opening of the first pitch brake is prevented.
A method of operating a wind energy installation including a rotor with a first rotor blade that can be adjusted in terms of its angle, a first adjustment drive for adjusting the first rotor blade, and a safety control device/system, the method comprising:
A wind energy installation, comprising:
Dependencies are inferred from the claim text.