Bottom hole type mudslide blocking dam and dam height calculation method
AssigneeSouthwest Jiaotong University
InventorsWeigang Shen, Xiaoyan Zhao, Gang Luo, YI Liu, Feng Dai, Ning Ma
Life of this patent
Estimating the term…
Loading patent…
AssigneeSouthwest Jiaotong University
InventorsWeigang Shen, Xiaoyan Zhao, Gang Luo, YI Liu, Feng Dai, Ning Ma
Estimating the term…
The present invention relates to the technical field of mudslide prevention and control engineering, and provides a bottom hole type mudslide blocking dam and a dam height calculation method. According to the present invention, a climbing height of the mudslide impacting a bottom hole type mudslide blocking dam can be accurately calculated, so as to guide the height design of a dam body of the bottom hole type mudslide blocking dam, thereby guaranteeing the working safety and the protection capacity of the bottom hole type mudslide blocking dam, and saving the manufacturing cost of the bottom hole type mudslide blocking dam.
A method for calculating a dam height of a bottom hole type mudslide blocking dam, comprising:
Dependencies are inferred from the claim text.