A method of well integrity assessment in an interval including a casing, a tubing string and a production packer placed inside the casing, and a cement sheath and rocks adjacent thereto, comprising the following phases:
- identifying at least two target zones for cement plug installation, wherein one target zone is situated above the production packer and the other is situated below the production packer;
- pressure testing the at least two target zones;
- assessing an integrity of the at least two target zones based on steady pressure data or pressure variation in time;
- perforating the tubing string, the casing, and the cement sheath in the at least in two target zones;
- installing an inflatable packer between the at least two target zones;
- initiating a repeat pressure test of the target zone;
- during the repeat pressure test, conducting a logging survey including acoustic, temperature, and defectoscopy in the at least two target zones;
- issuing a findings report on integrity of the casing and the cement sheath for subsequent installation of the cement plug for well abandonment via rigless operations or remedial cementing at designated locations where integrity failures have been identified based on the logging survey.