Prefabricated concrete beam-column node and construction method therefor
AssigneeHainan University
InventorsYun Chen, Qijun Zhang
Life of this patent
Estimating the term…
Loading patent…
AssigneeHainan University
InventorsYun Chen, Qijun Zhang
Estimating the term…
The present application relates to a prefabricated concrete beam-column node and a construction method thereof. The construction method of the prefabricated concrete beam-column node includes: assembling node connectors, and mounting studs on each node connector; welding a circumferential reinforcing plate with a groove hole in the center to a middle-rear section of each node connector; mounting a longitudinal rebar on each circumferential reinforcing plate; pouring a concrete beam between two circumferential reinforcing plates; welding a hidden corbel to a side flange of each of structural columns; hoisting the concrete beam, and overlapping each node connector with the corresponding hidden corbel; welding each node connector to the corresponding structural column; and pouring the concrete beam between the circumferential reinforcing plates and the structural columns.
A construction method for a prefabricated concrete beam-column node, comprising:
A prefabricated concrete beam-column node, comprising:
Dependencies are inferred from the claim text.