# US 11,656,887 B2 · System and method to simulate demand and optimize control parameters for a technology platform

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,656,887 B2
- Document ID: US11656887B2
- Status: Granted
- Kind: B2
- Application number: 17/411,222
- Filed: 2021-08-25
- Published: 2022-03-03
- Granted: 2023-05-23
- Earliest claimed: 2020-08-27
- Assignees: Smart Software, Inc.
- Applicants: Smart Software, Inc.
- Inventors: Thomas Reed Willemain; Nelson Seth Hartunian
- Web page: https://patentgrep.com/patent/US11656887B2

## CPC

- G06F 9/455: Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G05B 13/0265: {the criterion being a learning criterion}
- G05B 13/042: {in which a parameter or coefficient is automatically adjusted to optimise the performance}
- G05B 13/048: {using a predictor}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A system and method are presented for optimizing choices of control parameters. A method includes collecting demand sequences each associated with a resource managed by a technology platform; processing a demand sequence for a resource to calculate an optimized control parameter (CP) value set to manage an automated process within the technology platform, wherein calculating includes: processing the demand sequence with an advanced bootstrap process to generate a collection of bootstrapped demand sequences; processing the bootstrapped demand sequences with a performance prediction process that models the automated process to predict a performance metric for an initially selected CP value set; identifying a neighborhood of CP value sets that includes neighbors and the initially selected CP value set; predicting the performance metric for each neighbor with the performance prediction process; and identifying from the neighborhood of CP value sets the optimized CP value set that provides a best performance metric.

## Claims

### Claim 1

A system, comprising:
a memory; and
a processor coupled to the memory and configured to process demand data for a set of resources according to a method that includes:
collecting demand sequences, wherein each demand sequence is associated with a resource managed by a technology platform;
processing a demand sequence for a selected resource to calculate an optimized control parameter (CP) value set adapted to manage an automated process within the technology platform, wherein calculating the optimized CP value set for the selected resource includes:
processing the demand sequence to generate a collection of bootstrapped demand sequences, wherein the bootstrapped demand sequences are generated with a bootstrap process that includes:
detecting a trend in the demand sequence, wherein detecting includes differentiating between a mild trend or a strong trend;
in response to a detected mild trend, utilizing a shifted resampling probability distribution to generate a collection of bootstrapped demand sequences; and
in response to a detected strong trend, adding values to a beginning or end of a demand distribution and changing resampling probabilities to generate a collection of bootstrapped demand sequences;
processing the bootstrapped demand sequences with a performance prediction process that models the automated process to predict a performance metric for an initially selected CP value set;
identifying a neighborhood of CP value sets that includes neighbors and the initially selected CP value set;
predicting the performance metric for each neighbor with the performance prediction process; and
identifying from the neighborhood of CP value sets the optimized CP value set that provides a best performance metric.

### Claim 2 (depends on 1)

The system of claim 1, wherein calculating the optimized CP value set further includes:
determining whether the initially selected CP value set provides the best performance metric; and
in response to determining that the initially selected CP value set does not provide the best performance metric, evaluating a new neighborhood of CP value sets that neighbor and include the optimized CP value set with the performance prediction process to identify a further optimized CP value set that provides the best performance metric within the new neighborhood.

### Claim 3 (depends on 1)

The system of claim 1, wherein the performance prediction process uses a Monte Carlo simulation that models the automated process.

### Claim 4 (depends on 1)

The system of claim 1, wherein the performance metrics calculated for all bootstrapped demand sequences for a selected CP value set are averaged to provide a composite performance metric.

### Claim 5 (depends on 1)

The system of claim 1, wherein the CP value set includes a pair of parameters that includes at least one of: (Reorder Point, Order Quantity), (Min, Max) or (Review Interval, Order-up-to Level).

### Claim 6 (depends on 1)

The system of claim 1, wherein the set of resources are selected from a group consisting of: computing resources, energy resources, web resources, communication resources, physical or virtual components, autonomous vehicles, units of inventory, or Stock Keeping Unit (SKU) identifiers.

### Claim 7 (depends on 1)

The system of claim 1, wherein the technology platform is selected from a group consisting of: a cloud computing system, a communication network, a computer network, a control system, a machine, an autonomous vehicle fleet management system, an enterprise resource planning system, or an inventory management service.

### Claim 8 (depends on 1)

The system of claim 1, wherein the performance metric includes a cost value.

### Claim 9

A method for processing demand data for a set of resources in a technology platform, comprising:
collecting demand sequences, wherein each demand sequence is associated with a resource managed by a technology platform;
processing a demand sequence for a selected resource to calculate an optimized control parameter (CP) value set adapted to manage an automated process within the technology platform, wherein calculating the optimized CP value set for the selected resource includes:
processing the demand sequence to generate a collection of bootstrapped demand sequences, wherein the bootstrapped demand sequences are generated with a bootstrap process that includes:
detecting a trend in the demand sequence, wherein detecting includes differentiating between a mild trend and a strong trend;
in response to a detected mild trend, utilizing a shifted resampling probability distribution to generate a collection of bootstrapped demand sequences; and
in response to a detected strong trend, adding values to a beginning or end of a demand distribution and changing resampling probabilities to generate a collection of bootstrapped demand sequences;
processing the bootstrapped demand sequences with a performance prediction process that models the automated process to calculate
the optimized CP value set that provides a best performance metric.

### Claim 10 (depends on 9)

The method of claim 9, wherein calculating the optimized CP value set further includes:
predicting a performance metric for an initially selected CP value set
identifying a neighborhood of CP value sets that includes neighbors and the initially selected CP value set;
predicting the performance metric for each neighbor with the performance prediction process; and
identifying from the neighborhood of CP value sets the optimized CP value set that provides a best performance metric.

### Claim 11 (depends on 10)

The method of claim 10 wherein calculating the optimized CP value set further includes:
determining whether the initially selected CP value set provides the best performance metric; and
in response to determining that the initially selected CP value set does not provide the best performance metric, evaluating a new neighborhood of CP value set that neighbor and include the optimized CP value set with the performance prediction process to identify a further optimized CP value set that provides the best performance metric within the new neighborhood.

### Claim 12 (depends on 9)

The method of claim 9, wherein the performance prediction process uses a Monte Carlo simulation that models the automated process.

### Claim 13 (depends on 9)

The method of claim 9, wherein the performance metrics calculated for all bootstrapped demand sequences for a selected CP value set are averaged to provide a composite performance metric.

### Claim 14 (depends on 9)

The method of claim 9, wherein the set of resources are selected from a group consisting of: computing resources, energy resources, web resources, communication resources, physical or virtual components, autonomous vehicles, units of inventory, or Stock Keeping Unit (SKU) identifiers.

### Claim 15 (depends on 9)

The method of claim 9, wherein the technology platform is selected from a group consisting of: a cloud computing system, a communication network, a computer network, a control system, a machine, an enterprise resource planning system, an autonomous vehicle fleet management system, or an inventory management service.

### Claim 16

A method for processing demand data for a set of resources in a technology platform, comprising:
collecting demand sequences, wherein each demand sequence is associated with a resource managed by a technology platform;
processing a demand sequence for a selected resource to calculate an optimized control parameter (CP) value set usable as inputs to manage an automated process within the technology platform, wherein calculating the optimized CP value set for the selected resource includes:
processing the demand sequence to generate a collection of bootstrapped demand sequences, wherein the bootstrapped demand sequences are generated with a bootstrap process that includes:
detecting a trend in the demand sequence, wherein detecting includes differentiating between a mild trend and a strong trend;
in response to a detected mild trend, utilizing a shifted resampling probability distribution to generate a collection of bootstrapped demand sequences; and
in response to a detected strong trend, adding values to a beginning or end of a demand distribution and changing resampling probabilities to generate a collection of bootstrapped demand sequences;
processing the bootstrapped demand sequences with a performance prediction process that models the automated process to predict an associated performance metric for an initially selected CP value set; and
utilizing the initially selected CP value set and the associated performance metric as an initial solution to selectively search an N-dimensional solution space for an optimal solution, wherein N is a number of control parameters in the solution space.

### Claim 17 (depends on 16)

The method of claim 16, wherein selectively searching the N-dimensional solution space for the optimal solution includes:
identifying a neighborhood of CP value sets that includes neighbors and the initially selected CP value set;
predicting the performance metric for each neighbor with the performance prediction process; and
identifying from the neighborhood of CP value sets the optimized CP value set that provides a best performance metric.