Model predictive maintenance system with short-term scheduling
AssigneeJohnson Controls Tyco IP Holdings LLP
InventorsYaqing Wu, Mohammad N. Elbsat, Michael J. Wenzel, Christos T. Maravelias
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Tyco IP Holdings LLP
InventorsYaqing Wu, Mohammad N. Elbsat, Michael J. Wenzel, Christos T. Maravelias
Estimating the term…
A method for performing model predictive maintenance (MPM) of building equipment includes obtaining a first objective function that defines a cost of operating the building equipment and at least one of replacing the building equipment or performing maintenance on the building equipment as a function of operating decisions and at least one of replacement decisions or maintenance decisions for the building equipment for multiple short-term time steps within a short-term horizon. The method also includes performing a first optimization of the first objective function to generate a short-term maintenance and replacement schedule for the building equipment over a duration of the short-term horizon. The method also includes using a result of the first optimization to perform a second optimization of a second objective function to generate a long-term maintenance and replacement schedule for the building equipment over a duration of a long-term horizon.
A controller for performing model predictive maintenance (MPM) of building equipment, the controller comprising:
A method for performing model predictive maintenance (MPM) of building equipment, the method comprising:
A model predictive maintenance (MPM) system for building equipment, the system comprising:
Dependencies are inferred from the claim text.