Safety early warning method and device for full-section tunneling of tunnel featuring dynamic water and weak surrounding rock
AssigneeInstitute of Rock and Soil Mechanics, Chinese Academy of Sciences
InventorsHongming Luo, Jun Gao, Shanxiong Chen, Xiao Lin, Lingfa Jiang, Liyun Yang, Min Chen, Yu Tang, Dean Liu, Sheng Wang, Xuejun Peng, Wenguo Yang, Xiaobo Xie, Xingli Li, Dexing Wu, Xiaozhen Xiang
Life of this patent
Estimating the term…