Construction device and method for operating a construction device
AssigneeBAUER Spezialtiefbau GmbH
InventorsHerbert Karl, Robert Kulzinger, Josef Stöckl
Life of this patent
Estimating the term…
Abstract
The invention relates to a construction device and to a method for operating this construction device, comprising a carrier device, an approximately vertical mast, which is mounted on the carrier device, a movement element, which is vertically movable along a linear guide on the mast, and at least one GPS receiving unit, which is arranged in the region of the mast. According to the invention, it is provided that the at least one GPS receiving unit is attached to the movement element and that the at least one GPS receiving unit can be moved between an upper, first measuring position and a lower, second measuring position by means of the movement element.
Claims9
A construction device, comprising:
- a carrier device,
- an approximately vertical mast, which is mounted on the carrier device,
- a movement element, which is vertically movable along a linear guide on the mast, and
- at least one global positioning system (GPS) receiving unit, which is arranged in a region of the mast,
- characterized in that
- the movement element is a beam-shaped leader element,
- in that the at least one GPS receiving unit is attached in an upper region of the leader element,
- in that the leader element comprises a linear slide guide on a front side facing away from the mast,
- in that a slide is provided which is mounted vertically movably along a slide conveyor of the leader element, and
- in that the at least one GPS receiving unit is configured to move between an upper, first measuring position and a lower, second measuring position by means of the leader element.
Dependencies are inferred from the claim text.