Back to results
US 11,614,728 B2Granted
Machine tool management system that obtains a next maintenance period from a maintenance period model and a refinement algorithm
AssigneeFanuc Corporation
InventorXiaoguang Qi
Life of this patent
Estimating the term…
Abstract
A machine tool management system connects an external server and a large number of NC devices controlling the external server and respective machine tools through a network. The system collects several kinds of signal data from the NC device of each machine tool to the external server. In the system, the external server stores a maintenance period model and a refinement algorithm and obtains a next maintenance period from the maintenance period model.
Claims2
A machine tool management system, comprising:
- an external server;
- and
- a plurality of numerical controller (NC) devices connected to the external server through a network, the NC devices controlling respective machine tools,
- wherein the external server is configured to collect operating information obtained from the NC device of each machine tool, and comprises:
- storing unit storing a maintenance period model and a refinement algorithm in advance;
- changing unit changing a computational expression of the maintenance period model by the refinement algorithm;
- and
- computing unit obtaining a next maintenance period from the maintenance period model,
- wherein a maintenance of at least one of the machine tools is executed in accordance with the next maintenance period obtained by the external server, and
- wherein an initial set value of the maintenance period model is T=T0, and the next maintenance period is expressed by the refinement algorithm:
- T=T0·[(1+tn1/T0)·(1+tn2/T0)···(1+tn1/T0)]·[(1−tm1/T0)·(1+tm2/T0)···(1+tmj/T0)]
- m1, m2 . . . mj denote signals associated with shortening of a maintenance part life,
- tm1, tm2 tmj denote accumulated time of each corresponding signal m1, m2 . . . mj within the maintenance period,
- n1, n2 . . . ni denote signals associated with extension of the maintenance part life,
- tn1, tn2 tni denote accumulated time of each corresponding signal n1, n2 . . . ni within the maintenance period, and
- i and j are positive integers greater than 1.
13 more elements
Dependencies are inferred from the claim text.