Independent control for simultaneous fracturing of multiple wellbores
AssigneeHalliburton Energy Services, Inc.
InventorsMichael Linley Fripp, Chad A. Fisher, Mehdi Mazrooee, Ronald Glen Dusterhoft
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsMichael Linley Fripp, Chad A. Fisher, Mehdi Mazrooee, Ronald Glen Dusterhoft
Estimating the term…
A system and method for independent control of simultaneous fracturing for multiple wellbores is disclosed. In certain embodiments, a first clean pumping unit and a first dirty pumping unit are fluidically coupled to a first wellbore, wherein the first clean pumping unit pumps a first fluid to the first wellbore and the second clean pumping unit pumps a second fluid to the first wellbore. In certain embodiments, a second clean pumping unit and a second dirty pumping unit are fluidically coupled to a second wellbore, wherein the second clean pumping unit pumps the first fluid to the second wellbore and the second dirty pumping unit pumps. In certain embodiments, a controller controls a pumping rate of at least one of the first clean pumping unit and the first dirty pumping unit based on a desired parameter of a combined fluid pumped to the first wellbore.
A system comprising:
A method, comprising:
A system, comprising:
Dependencies are inferred from the claim text.