# US 11,593,730 B2 · Schedule creation device, schedule creation method, and program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,593,730 B2
- Document ID: US11593730B2
- Status: Granted
- Kind: B2
- Application number: 15/734,592
- Filed: 2019-04-24
- Published: 2021-07-29
- Granted: 2023-02-28
- Earliest claimed: 2018-08-31
- Assignees: Mitsubishi Heavy Industries, Ltd.
- Applicants: Mitsubishi Heavy Industries, Ltd.
- Inventors: Tatsuki Takazaki
- Web page: https://patentgrep.com/patent/US11593730B2

## CPC

- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 19/4189: {characterised by the transport system}
- G06Q 10/06393: {Score-carding, benchmarking or key performance indicator [KPI] analysis}
- G06Q 50/04: Manufacturing
- G05B 2219/31023: Master production scheduler and microprocessor and schedule analysis and shop control
- G05B 2219/32252: Scheduling production, machining, job shop
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- Y02P 90/30: Computing systems specially adapted for manufacturing
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Provided is a schedule creation device for creating a conveyance schedule according to which a conveyance device conveys a product to work positions designated for each manufacturing process. Said schedule creation device sets a first score to the work positions and to a conveyance path of the conveyance device; sets a second score for products; and uses the first score and the second score to determine the product to be conveyed by the conveyance device from among products present at a plurality of work positions.

## Claims

### Claim 1

A schedule creation device for creating a transport schedule of an automated transport device on which a product is transported to a work position determined for each production process by the automated transport device, based on a production schedule which is determined in advance and defines an execution time of a production work for each production process in a production line configured to perform the production work at the work position determined for each production process to manufacture the product, such that the production work is started at the execution time defined in the production schedule, the schedule creation device comprising:
a schedule creation unit configured to set a first score to the work position and a transport path of the automated transport device, set a second score to the product, and decide the product to be transported by the automated transport device from among the products present at a plurality of the work positions based on the first score and the second score, and
an output unit configured to output an instruction to the automated transport device to cause the automated transport device to move along the transport path to transport the product decided by the schedule creation unit from a first work position within the plurality of the work positions to a second work position within the plurality of the work positions,
wherein the production schedule is provided to the schedule creation device from outside,
wherein the schedule creation unit is configured to set the first score based on whether or not passage of the automated transport device to the work position and the transport path is possible and set, based on a preset priority of each work position, the second score of the product present at the work position,
wherein the first score is set to a value corresponding to a hardness of passage of the automated transport device, the second score is set to a value corresponding to a level of a priority of production work of the product with the second score set, and the schedule creation unit is configured to select the product having the second score set to a greater value than the first score set to the transport path of the product, to which the second score is set, as a transport candidate,
wherein the schedule creation unit is configured to decide to retract the product, to which a maximum second score is set, in a case where there is no product to which the second score greater than the first score set to the transport path of the product is set, and
wherein, in a case where there is a plurality of the automated transport devices, the schedule creation unit is configured to set the first score of the transport path, through which the automated transport device having already decided the product to transport passes, to a value such that passage of another automated transport device is impossible.

### Claim 2 (depends on 1)

The schedule creation device according to claim 1,
wherein the schedule creation unit is configured to set the first score to the work position based on presence or absence of the product present at the work position and a situation of production work to the product.

### Claim 3 (depends on 1)

The schedule creation device according to claim 1,
wherein the schedule creation unit is configured to set the second score based on a work start time at the work position determined in a predetermined production schedule in addition to the priority of each work position.

### Claim 4 (depends on 1)

The schedule creation device according to any claim 1,
wherein the schedule creation unit is configured to update the first score of the transport path, through which the automated transport device transporting the product passes, based on the second score of the product that is transported by the automated transport device.

### Claim 5 (depends on 1)

The schedule creation device according to claim 1,
wherein, when the product is allocated to the automated transport device, the schedule creation unit is configured to calculate a correspondence relationship between the work position after the product is transported and the product, calculate the first score after transport and the second score of the product based on the correspondence relationship, and decide the product to be transported next.

### Claim 6 (depends on 1)

The schedule creation device according to claim 1, further comprising the automated transport device configured to move from the first work position to the second work position in response to receiving the instruction from the output unit.

### Claim 7 (depends on 1)

The schedule creation device according to claim 1,
wherein the schedule creation unit is configured to set the second score by calculating a possible number of times of transport by dividing a time until a production work start time at the work position determined in the production schedule by a time needed for transport, and subtracting the calculated possible number of times of transport from the second score.

### Claim 8

A schedule creation method comprising,
creating, using a schedule creation device, a transport schedule of an automated transport device on which a product is transported to a work position determined for each production process by the automated transport device, based on a production schedule which is determined in advance and defines an execution time of a production work for each production process in a production line configured to perform the production work at the work position determined for each production process to manufacture the product, such that the production work is started at the execution time defined in the production schedule,
setting a first score to the work position and a transport path of the automated transport device, sets a second score to the product, and decides the product to be transported by the automated transport device from among the products at a plurality of the work positions based on the first score and the second score; and
causing the automated transport device to move along the transport path to transport the product decided by the schedule creation unit from one work position within the plurality of the work positions to a second work position within the plurality of the work positions,
wherein the production schedule is provided to the schedule creation device from outside,
wherein the schedule creation unit is configured to set the first score based on whether or not passage of the automated transport device to the work position and the transport path is possible and set, based on a preset priority of each work position, the second score of the product present at the work position,
wherein the first score is set to a value corresponding to a hardness of passage of the automated transport device, the second score is set to a value corresponding to a level of a priority of production work of the product with the second score set, and the schedule creation unit is configured to select the product having the second score set to a greater value than the first score set to the transport path of the product, to which the second score is set, as a transport candidate,
wherein the schedule creation unit is configured to decide to retract the product, to which a maximum second score is set, in a case where there is no product to which the second score greater than the first score set to the transport path of the product is set, and
wherein, in a case where there is a plurality of the automated transport devices, the schedule creation unit is configured to set the first score of the transport path, through which the automated transport device having already decided the product to transport passes, to a value such that passage of another automated transport device is impossible.

### Claim 9 (depends on 8)

The schedule creation method according to claim 8, further comprising moving the automated transport device from the first work position to the second work position.

### Claim 10

A program causing a computer of a schedule creation device to:
create a transport schedule of an automated transport device on which a product is transported to a work position determined for each production process by the automated transport device, based on a production schedule which is determined in advance and defines an execution time of a production work for each production process in a production line configured to perform the production work at the work position determined for each production process to manufacture the product, such that the production work is started at the execution time defined in the production schedule,
set a first score to the work position and a transport path of the automated transport device;
set a second score to the product;
decide the product to be transported by the automated transport device from among the products present at a plurality of the work positions based on the first score and the second score; and
cause the automated transport device to move along the transport path to transport the product decided by the schedule creation unit from one work position within the plurality of the work positions to a second work position within the plurality of the work positions,
wherein the production schedule is provided to the schedule creation device from outside,
wherein the schedule creation unit is configured to set the first score based on whether or not passage of the automated transport device to the work position and the transport path is possible and set, based on a preset priority of each work position, the second score of the product present at the work position,
wherein the first score is set to a value corresponding to a hardness of passage of the automated transport device, the second score is set to a value corresponding to a level of a priority of production work of the product with the second score set, and the schedule creation unit is configured to select the product having the second score set to a greater value than the first score set to the transport path of the product, to which the second score is set, as a transport candidate,
wherein the schedule creation unit is configured to decide to retract the product, to which a maximum second score is set, in a case where there is no product to which the second score greater than the first score set to the transport path of the product is set, and
wherein, in a case where there is a plurality of the automated transport devices, the schedule creation unit is configured to set the first score of the transport path, through which the automated transport device having already decided the product to transport passes, to a value such that passage of another automated transport device is impossible.

### Claim 11 (depends on 10)

The program according to claim 10, wherein the schedule creation device is further caused to move the automated transport device configured from the first work position to the second work position.