Building system with flexible facility operation
AssigneeJohnson Controls Tyco IP Holdings LLP
InventorsClay G. Nesler, Jonathan Douglas, Kirk H. Drees, Bernard P. Clement, Joseph Pustai, Jr.
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Tyco IP Holdings LLP
InventorsClay G. Nesler, Jonathan Douglas, Kirk H. Drees, Bernard P. Clement, Joseph Pustai, Jr.
Estimating the term…
A building system for a building including one or more storage devices storing instructions thereon that, when executed by one or more processors, cause the one or more processors to operate one or more pieces of building equipment associated with a building space based on a first operating mode. The instructions cause the one or more processors to receive an indication to update operation of the building space based on an emergency situation and responsive to receiving the indication to update operation of the building space based on the emergency situation, operate the one or more pieces of building equipment based on a second operating mode, wherein the second operating mode defines one or more second parameters for the one or more pieces of building equipment and is adapted to reconfigure the operation of the building space to address or mitigate the emergency situation.
A building system for a building comprising one or more storage devices storing instructions thereon that, when executed by one or more processors, cause the one or more processors to:
A method of a building system of a building comprising:
A building system for a building comprising:
Dependencies are inferred from the claim text.