Sewage treatment process, coupled with a modified flexible flotation/decanting system, for the treatment of sewage, in that it is carried out at a treatment station, in a continuous, linear, and flexible channel, using the following stages:
- PHASE 1—preliminary treatment of the sewage, with the installation of a garbage-trap grid, followed by a sandbox in the channel, wherein the garbage-trap grid traps floating and submerged solid waste, and the sandbox traps sand and silt contained in sewage flow, and the sewage flows through the continuous, linear, and flexible channel, to a PHASE 2 of the treatment, which constitutes the primary treatment;
- PHASE 2—Primary treatment of the sewage, wherein the sewage from Phase 1 is provided primary treatment inside a modified MBBR aerobic reactor;
- the reactor modification comprising installing impermeable walls inside an MBBR aerobic reactor, to form channels inside the MBBR aerobic reactor itself, in order to channel the sewage flow from an inlet to an outlet of the modified MBBR aerobic reactor;
- at the passageways formed by said channels, respective cage-shaped traps are installed, which accommodate and trap biomedia, and the biomedia move within the cage-shaped traps, driven by aerators installed at a bottom of the modified MBBR aerobic reactor;
- said primary treatment comprises oxygen-enriched aeration that stirs the biomedia inside the modified MBBR aerobic reactor, and, after primary treatment, the sewage from this PHASE 2 is directed to PHASE 3, wherein it is provided secondary treatment;
- and
- PHASE 3—Secondary treatment of the sewage from PHASE 2, wherein the sewage, after leaving PHASE 2, is routed to the secondary treatment by the modified, flexible decanting/flotation system, whereby the sewage need not pass through an equalization tank, and a routing modification is carried out within the continuous, linear, and flexible channel by installation of a longitudinal septum arranged in a centralized or decentralized manner in relation to the continuous, linear, and flexible channel, equipped with individual inlet gates;
- the longitudinal septum being arranged along an inside area of said continuous, linear, and flexible channel, to split the continuous, linear, and flexible channel into at least two parallel linear sub-channels, allowing individual operation of each sub-channel, independently from each other;
- the secondary treatment by the flexible, modified decanting/flotation system being carried out with a coagulation stage and a flocculation stage, using a mixture of coagulant and flocculant, followed by flotation or decanting, removal of floated sludge or decanted sludge, and passage of treated sewage;
- the treated sewage flowing to a receiving water body.