Blasting system and operating method for same
AssigneeHanwha Corporation
InventorsKi Woong Park, Tae Seob Shin
Life of this patent
Estimating the term…
Abstract
The present disclosure relates to a blasting system, the blasting system including: a drilling device configured to form blasting holes on a blasting target on the basis of a blasting design map; a charging device configured to place explosives in the blasting holes; detonators configured to detonate the explosives; a central control unit configured to confirm a position of a worker in real time, the worker driving the detonators; and a worker terminal configured to transmit worker position information to the central control unit, the worker position information indicating the worker position. The blasting system of the present disclosure can automatically connect the detonator to the central control unit, and improve worker convenience of the blasting work.
Claims11
A blasting system comprising:
- a drilling device configured to form blasting holes on a blasting target on the basis of a blasting design map;
- a charging device configured to place explosives in the blasting holes;
- detonators configured to detonate the explosives;
- a central control unit configured to confirm a position of a worker in real time, the worker driving the detonators;
- and
- a worker terminal configured to transmit worker position information to the central control unit, the worker position information indicating the worker position,
- wherein the detonators are configured such that, when a detonator is driven by the worker, the detonator transmits a register request to the central control unit, and
- the central control unit comprises a detonator setting part configured to match the worker position at a time when the central control unit receives the register request with the blasting design map, to identify the detonator transmitting the register request, and to transmit setting data corresponding to the identified detonator to the identified detonator, and
- the setting data includes setting information, an initialization time, and a delay time.
An operating method for a blasting system, the operating method comprising:
- creating a blasting design map including designed positions where blasting holes are formed on a blasting target;
- arranging the blasting system on a blasting field where the blasting target is positioned, the blasting system including a central control unit, a drilling device, a charging device, and a worker terminal;
- forming, by the drilling device, the blasting holes on the basis of the blasting design map;
- placing explosives and detonators in the blasting holes by the charging device and then driving the detonators by a worker;
- matching a worker position at a time when the central control unit receives a register request with the blasting design map, identifying a detonator transmitting the register request, and transmitting setting data corresponding to the identified detonator to the identified detonator;
- preparing for blasting;
- and
- transmitting a blasting command to the detonator,
- wherein the detonators are configured such that, when a detonator is driven by the worker, the detonator transmits the register request to the central control unit, and
- the setting data includes setting information, an initialization time, and a delay time.
Dependencies are inferred from the claim text.