A fall protection cable system configured for installation of a roof on a steel building comprising:
- a starting support post configured for attachment to a first side of the steel building, said starting support post having a bottom starting end configured to attach to the first side of the steel building and a top starting end extending above the roof on the first side of the steel building, the starting support post including:
- a starting horizontal member with a starting plate at one end configured for attachment to the steel building;
- a starting vertical member rigidly attached to the starting horizontal member and extending upward therefrom, where the starting vertical member extends at a starting slightly obtuse angle from the end of the starting horizontal member with the starting plate, whereby the starting vertical member is oriented slightly past vertical from the end of the starting horizontal member with the starting plate;
- a starting ground anchor connected from an another end of the starting horizontal member to ground via a starting concrete anchor plate affixed thereto, where the starting ground anchor is connected to the another end of the starting horizontal member via a first eyebolt, and is connected to the starting concrete anchor via a starting turnbuckle cable connection configured for tensioning the starting ground anchor between the another end of the starting horizontal member and the ground;
- a final support post configured for attachment to a second side of the steel building, said final support post having a bottom final end configured to attach to the second side of the steel building and a top final end extending above the roof on the second side of the steel building, the final support post including:
- a final horizontal member with a final plate at one end configured for attachment to the steel building;
- a final vertical member rigidly attached to the final horizontal member and extending upward therefrom, where the final vertical member extends at a final slightly obtuse angle from the end of the final horizontal member with the final plate, whereby the final vertical member is oriented slightly past vertical from the end of the final horizontal member with the final plate;
- a final ground anchor connected from an another end of the final horizontal member to the ground via a final concrete anchor plate affixed thereto, where the final ground anchor is connected to the another end of the final horizontal member via a third eyebolt, and is connected to the final concrete anchor via a final turnbuckle cable connection configured for tensioning the final ground anchor between the another end of the final horizontal member and the ground;
- a support cable configured to be connected at an elevated position above the roof of the steel building between the top starting end of the starting support post attached to the first side of the steel building and the top final end of the final support post attached to the second side of the steel building.