Apply multi-physics principle for well integrity evaluation in a multi-string configuration
AssigneeHalliburton Energy Services, Inc.
InventorsYike Hu, Weijun Guo, Burkay Donderici
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsYike Hu, Weijun Guo, Burkay Donderici
Estimating the term…
The disclosure provides a well integrity monitoring tool for a wellbore, a method, using a nuclear tool and an EM tool, for well integrity monitoring of a wellbore having a multi-pipe configuration, and a well integrity monitoring system. In one example, the method includes: operating a nuclear tool in the wellbore to make a nuclear measurement at a depth of the wellbore, operating an EM tool in the wellbore to make an EM measurement at the depth of the wellbore, determining a plurality of piping properties of the multi-pipe configuration at the depth employing the EM measurement, determining, employing the piping properties, a processed nuclear measurement from the nuclear measurement, and employing the processed nuclear measurement to determine an integrity of a well material at the depth and within an annulus defined by the multi-pipe configuration.
A method, using a nuclear tool and an electromagnetic (EM) tool, for well integrity monitoring of a wellbore having a multi-pipe configuration, the method comprising:
A well integrity monitoring tool for a wellbore, comprising:
A well integrity monitoring system, comprising:
Dependencies are inferred from the claim text.