Methods and devices for selective insulation monitoring in ungrounded Isolé Terre (IT) power supply systems
AssigneeBender GmbH & Co. KG
InventorsDieter Hackl, Oliver Schaefer
Life of this patent
Estimating the term…
Abstract
Methods and devices for insulation monitoring of an ungrounded IT power supply system having at least two phase conductors includes determining an insulation resistance separately for each phase conductor using a separate response value. In one embodiment of the invention, relevant current and voltage distributions are calculated. In another embodiment, a change time window is set within which a second response value is activated. In yet another embodiment, an option of shutting down/continuing operation of the IT power supply system is offered.
Claims4
A method for insulation monitoring of an ungrounded IT power supply system having at least two phase conductors, comprising the method steps of:
- determining an insulation resistance of the IT power supply system and setting a first response value,
- once the first response value has been undercut, starting a change time window within which a set second response value is activated, and
- automatically shutting down the IT power supply system if the second response value is undercut within the change time window.
A device for insulation monitoring of an ungrounded IT power supply system having at least two phase conductors, comprising a detecting device for determining an insulation resistance value of the power supply system, the detecting device, for recognizing a first fault, comprising a first-fault recognition device having an adjustable first response value for the insulation resistance, wherein for recognizing a second fault, the detecting device comprises a second-fault recognition device having an adjusting device for setting a second response value for the insulation resistance, comprising an interval timer for defining a change time window and comprising a switch-signal unit that generates a shutdown signal to automatically shut down the IT power supply system if the second response value is undercut within the change time window.
Dependencies are inferred from the claim text.