# US 11,445,511 B2 · Method for information transmission adjustment, base station, and user equipment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,445,511 B2
- Document ID: US11445511B2
- Status: Granted
- Kind: B2
- Application number: 16/637,739
- Filed: 2017-08-10
- Published: 2020-07-02
- Granted: 2022-09-13
- Earliest claimed: 2017-08-10
- Assignees: Beijing Xiaomi Mobile Software Co., Ltd.
- Applicants: Beijing Xiaomi Mobile Software Co., Ltd.
- Inventors: Juejia Zhou
- Web page: https://patentgrep.com/patent/US11445511B2

## CPC

- H04W 72/53: based on regulatory allocation policies
- H04L 5/0092: {Indication of how the channel is divided}
- H04W 4/80: Services using short range communication, e.g. near-field communication [NFC], radio-frequency identification [RFID] or low energy communication
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/0453: Resources in frequency domain, e.g. a carrier in FDMA
- H04W 72/121: for groups of terminals or users
- H04W 72/1268: of uplink data flows
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A method for information transmission adjustment includes: determining control resource adjustment information for a target UE, the control resource adjustment information being control resource adjustment information based on original scheduling that has been adjusted; sending the control resource adjustment information to the target UE, so that the target UE monitors downlink control information in the time-frequency range to which adjusted control resources belong; based on the control resource adjustment information and the time-frequency resource range of the original scheduling, allocating transmission resources for the target UE, the frequency range of transmission resources including: the frequency range of the adjusted control resources; then performing information transmission between the base station and target UE. The method for information transmission adjustment can therefore enhance scheduling adjustment efficiency and reduce transmission delays caused by scheduling adjustment.

## Claims

### Claim 1

A method for adjusting information transmission, applied to a base station and comprising:
determining control resource adjustment information for target user equipment (UE), the control resource adjustment information being information of control resources adjusted based on original scheduling, wherein the control resource adjustment information is used for the UE to configure a portion of the adjusted control resources not overlapped with control resources in the original scheduling;
sending the control resource adjustment information to the target UE to enable the target UE to monitor downlink control information (DCI) within a time-frequency range to which the adjusted control resources belong;
allocating transmission resources to the target UE according to the control resource adjustment information and a time-frequency resource range for the original scheduling, a frequency range of the transmission resources at least comprising: a frequency range of the adjusted control resources; and
performing information transmission with the target UE through the transmission resources.

### Claim 2 (depends on 1)

The method according to claim 1, wherein determining the control resource adjustment information for the target UE comprises:
determining the control resource adjustment information according to an amount of information to be transmitted; or
determining the control resource adjustment information in response to a scheduling adjustment request from the target UE.

### Claim 3 (depends on 2)

The method according to claim 2, wherein determining the control resource adjustment information according to the amount of information to be transmitted comprises:
comparing a present amount of information to be transmitted by the base station on a BWP with a first preset threshold to obtain a comparison result, wherein a time-frequency range of the BWP contains a time-frequency resource range for the original scheduling; and
determining, in condition that the comparison result meets a first preset adjustment condition, the control resource adjustment information for the target UE.

### Claim 4 (depends on 2)

The method according to claim 2, wherein determining the control resource adjustment information according to the amount of information to be transmitted comprises:
determining a present amount of information to be transmitted for the target UE;
comparing the present amount of information to be transmitted with a second preset threshold to obtain a comparison result; and
determining, in condition that the comparison result meets a second preset adjustment condition, the control resource adjustment information for the target UE.

### Claim 5 (depends on 2)

The method according to claim 2, wherein determining the control resource adjustment information in response to the scheduling adjustment request from the target UE comprises:
receiving from the target UE a scheduling adjustment request for requesting to adjust a time-frequency range of control resources; and
determining the control resource adjustment information for the target UE according to the scheduling adjustment request.

### Claim 6 (depends on 5)

The method according to claim 5, wherein the scheduling adjustment request comprises: an identity of the control resources requested to be scheduled and
determining the control resource adjustment information for the target UE according to the scheduling adjustment request comprises:
determining the control resource adjustment information for the target UE according to the identity of the control resources requested to be scheduled.

### Claim 7 (depends on 1)

The method according to claim 1, wherein determining the control resource adjustment information for the target UE comprises:
adjusting a control resource range based on one or more control resource sets (CORESETs) provided for the original scheduling for the target UE; and
generating the control resource adjustment information according to an adjustment result of the control resource range.

### Claim 8 (depends on 7)

The method according to claim 7, wherein in condition that the time-frequency range of the control resources is adjusted from large to small, adjusting the control resource range comprises:
in condition that at least two CORESETs are provided for the original scheduling, selecting one or more CORESETs from the at least two CORESETs, and determining the selected CORESET as a target CORESET; or
in condition that at least one CORESET is provided for the original scheduling, selecting a part of control resources from the at least one CORESET, and determining the selected control resource as a target control resource region.

### Claim 9 (depends on 8)

The method according to claim 8, wherein adjusting the control resource range further comprises:
specifying a binding number of search resource element groups (REGs) for the target CORESET or the target control resource region;
wherein generating the control resource adjustment information according to the adjustment result of the control resource range comprises:
generating the control resource adjustment information according to a time-frequency position of the target CORESET, a time-frequency position of the target control resource region or the binding number of search REGs.

### Claim 10 (depends on 1)

The method according to claim 1, wherein allocating the transmission resources to the target UE according to the control resource adjustment information and the time-frequency resource range for the original scheduling comprises:
allocating control information transmission resources to the target UE according to the control resource adjustment information; and
allocating data transmission resources to the target UE according to the control resource adjustment information and the time-frequency resource range for the original scheduling.

### Claim 11 (depends on 1)

The method according to claim 1, further comprising:
canceling adjustment scheduling for control resources and resuming the original scheduling under a preset trigger condition;
wherein the control resource adjustment information further comprises: a preset duration of the adjustment scheduling; and
canceling the adjustment scheduling for the control resources and resuming the original scheduling under the preset trigger condition comprises:
resuming the original scheduling in response to expiration of the preset duration.

### Claim 12 (depends on 1)

A 5th-generation communication system implementing the method of claim 1, comprising the base station and the target UE, wherein:
based on changes in traffic to be transmitted or energy saving requirements, the base station is configured to adjust the control resource range scheduled at a next time based on the original scheduling of the target UE at a previous time, to enable the target UE to monitor DCI used for the target UE within a time-frequency range to which newly scheduled control resources belong, so as to perform information transmission with the base station through transmission resources indicated by the DCI;
part of the transmission scheduling information for the original scheduling including a time-frequency position of a CORESET is used as prior information in new scheduling, such that reconfiguration of the target UE is not performed, thereby shortening scheduling adjustment time, reducing control signaling overheads, saving wireless transmission resources and improving scheduling adjustment efficiency; and
the target UE is therefore enabled to freely switch between broadband and narrowband devices.

### Claim 13

A method for adjusting information transmission, applied to user equipment (UE), and comprising:
receiving control resource adjustment information sent by a base station, the control resource adjustment information being information of control resources adjusted by the base station based on original scheduling, wherein the control resource adjustment information is used for the UE to configure a portion of the adjusted control resources not overlapped with control resources in the original scheduling;
monitoring, according to the control resource adjustment information, downlink control information (DCI) in a time-frequency range to which the adjusted control resources belong; and
performing, according to the DCI, information transmission by using transmission resources scheduled by the base station.

### Claim 14 (depends on 13)

The method according to claim 13, wherein before receiving the control resource adjustment information sent by the base station, the method further comprises:
sending to the base station a scheduling adjustment request for requesting the base station to adjust a time-frequency range of control resources.

### Claim 15 (depends on 13)

The method according to claim 13, wherein the control resource adjustment information comprises at least one of the following:
a time-frequency position of any one of one or more target control resource sets (CORESETs) of all CORESETs in a band width part (BWP);
a time-frequency position of a part of control resource region in any one of one or more CORESETs of all the CORESETs; or
a binding number of search resource element groups (REGs) for a target control resource.

### Claim 16 (depends on 15)

The method according to claim 15, wherein monitoring, according to the control resource adjustment information, DCI in the time-frequency range to which the adjusted control resources belong comprises:
searching for DCI for the UE from a control resource region corresponding to any one of the one or more target CORESETs; or
searching for DCI for the UE from a part of control resource region in any one of the one or more CORESETs; or
searching for, according to the binding number of search REGs, DCI for the UE from a control resource region corresponding to any one of the one or more target CORESETs or a part of control resource region in any one of the one or more CORESETs.

### Claim 17 (depends on 13)

The method according to claim 13, wherein the control resource adjustment information further comprises: a preset duration of adjustment scheduling, the method further comprising:
performing, in response to expiration of the preset duration, transmitting information transmission according to a time-frequency resource range for the original scheduling.

### Claim 18

User equipment (UE), comprising:
a processor; and
memory for storing instructions executed by the processor,
wherein the processor is configured to:
receive control resource adjustment information sent by a base station, the control resource adjustment information being information of control resources adjusted by the base station based on original scheduling, wherein the control resource adjustment information is used for the UE to configure a portion of the adjusted control resources not overlapped with control resources in the original scheduling;
monitor, according to the control resource adjustment information, downlink control information (DCI) in a time-frequency range to which the adjusted control resources belong; and
perform information transmission according to the DCI by using transmission resources scheduled by the base station.

### Claim 19 (depends on 18)

The UE according to claim 18, wherein the processor is further configured to:
send to the base station a scheduling adjustment request for requesting the base station to adjust a time-frequency range of control resources.

### Claim 20 (depends on 18)

The UE according to claim 18, wherein the control resource adjustment information comprises at least one of the following:
a time-frequency position of any one of one or more target control resource sets (CORESETs) of all CORESETs in a band width part (BWP);
a time-frequency position of a part of control resource regions in any one of one or more CORESETs of all the CORESETs; or
a binding number of search resource element groups (REGs) for a target control resource;
wherein the processor is configured to:
search for DCI for the UE from a part of control resource region corresponding to any one of the one or more target CORESETs; or
search for DCI for the UE from a part of control resource region in any one of the one or more CORESETs; or
search for, according to the binding number of search REGs, DCI for the UE from the control resource region corresponding to any one of the one or more target CORESET or a part of control resource regions in any one of the one or more CORESETs.
