# US 11,444,459 B2 · Adaptive control for networked renewable power plants

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,444,459 B2
- Document ID: US11444459B2
- Status: Granted
- Kind: B2
- Application number: 16/618,689
- Filed: 2018-05-15
- Published: 2021-05-13
- Granted: 2022-09-13
- Earliest claimed: 2017-05-31
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Manoj Gupta; Ravi Kumar; Janakiraman Sivasankaran; Mario Dante Jardiel; Anoop Vijay Tiwari; Kouroush Nayebi
- Web page: https://patentgrep.com/patent/US11444459B2

## CPC

- H02J 3/381: {Dispersed generators}
- G05B 15/02: electric
- H02J 3/001: Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 3/18: Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- F03D 7/0284: {in relation to the state of the electric grid}
- H02J 2101/20: Dispersed power generation using renewable energy sources
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- F03D: WIND MOTORS

## Abstract

There is provided a method of operating a renewable power plant that is connected to a wider power network by a bus. The method comprises: identifying a predetermined voltage condition of the renewable power plant or of the bus; controlling the renewable power plant to maintain zero reactive power exchange at the bus for a first period; calculating an average voltage level of the bus that was achieved during the first period; and controlling the renewable power plant to maintain the voltage output at a set voltage level for a second period, the set voltage level being substantially equal to the calculated average voltage level. The method ensures that voltage oscillations due to a push-pull phenomenon between a power plant controller and the power network do not upset the stability of the grid.

## Claims

### Claim 1

A method of operating a renewable power plant that is connected to a wider power network by a bus, the method comprising:
identifying a predetermined voltage condition of the renewable power plant or of the bus;
performing an operation iteratively until an end condition is detected, wherein the operation comprises:
controlling the renewable power plant to maintain zero reactive power exchange at the bus for a first period;
calculating an average voltage level of the bus that was achieved during the first period; and
controlling the renewable power plant to maintain a voltage output at a set voltage level for a second period, the set voltage level being substantially equal to the calculated average voltage level, wherein a duration of the second period is reduced between a pair of consecutive iterations of the operation; and
reverting to a previous control mode when the end condition is detected.

### Claim 2 (depends on 1)

The method of claim 1, further comprising identifying that a weak grid interconnection exists and performing the remaining steps of the method if a weak grid interconnection exists.

### Claim 3 (depends on 2)

The method of claim 2, wherein the existence of a weak grid interconnection is identified based upon at least one of: a short circuit ratio of the bus; a status of at least one protection system associated with the power network; and a phase angle difference between two buses within the power network.

### Claim 4 (depends on 1)

The method of claim 1, wherein the method is performed following a power network fault, and wherein identifying a predetermined voltage condition comprises controlling the renewable power plant to maintain the voltage output at a set voltage level for a third time period, the set voltage level being substantially equal to a pre-fault voltage level.

### Claim 5 (depends on 4)

The method of claim 4, wherein the third time period and the second period are substantially similar.

### Claim 6 (depends on 1)

The method of claim 1, further comprising at least one of the following:
calculating a difference between the set voltage level and an average calculated voltage of consecutive iterations and comparing the difference with a threshold range of values;
calculating a number of completed iterations and comparing the number with a predetermined iterations threshold;
measuring an elapsed time and comparing the elapsed time with a predetermined time threshold;
monitoring a parameter used to identify a weak grid interconnection; or
receiving commands to operate the renewable power plant in a different mode.

### Claim 7 (depends on 1)

The method of claim 1 comprising measuring a plurality of voltage samples, each sample being measured over a pre-determined sample period, and wherein calculating the average voltage level is based on the plurality of voltage samples.

### Claim 8 (depends on 1)

The method of claim 1, wherein the duration of the first period is shorter than the duration of the second period.

### Claim 9 (depends on 1)

The method of claim 1 comprising comparing the set voltage level with a predetermined voltage threshold, and if the set voltage level is above the threshold, measuring an active power output of the renewable power plant and controlling the renewable power plant so that active power output remains below the measured active power output.

### Claim 10 (depends on 9)

The method of claim 9, wherein the predetermined voltage threshold is 1.1 pu.

### Claim 11

A power plant controller for a renewable power plant having a plurality of wind turbine generators and connected to a wider power network by a bus, wherein the controller comprises a processor, a memory, and an input/output system, and wherein the memory includes a set of program code instructions which when executed by the processor, implement an operation, comprising:
identifying a predetermined voltage condition of the renewable power plant or of the bus;
performing an operation iteratively until an end condition is detected, wherein the operation comprises:
controlling the renewable power plant to maintain zero reactive power exchange at the bus for a first period;
calculating an average voltage level of the bus that was achieved during the first period; and
controlling the renewable power plant to maintain a voltage output at a set voltage level for a second period, the set voltage level being substantially equal to the calculated average voltage level, wherein a duration of the second period is reduced between a pair of consecutive iterations of the operation; and
reverting to a previous control mode when the end condition is detected.

### Claim 12

A method of operating a renewable power plant connected to a power network by a first bus, the method comprising:
identifying a predetermined condition of the power network;
performing an operation iteratively until the predetermined condition stops, wherein the operation comprises:
measuring an active power output of the renewable power plant;
identifying a predetermined natural voltage level of the power network that corresponds to the measured active power output; and
controlling the renewable power plant to maintain a voltage output at a set voltage level that is substantially equal to a natural voltage level for a period of time, wherein the period of time is reduced between a pair of consecutive iterations of the operation; and
reverting to a previous control mode when the predetermined condition stops.

### Claim 13 (depends on 12)

The method of claim 12, wherein identifying a predetermined condition of the power network comprises determining at least one of: a short-circuit ratio; a phase angle difference between two buses forming part of the power network; and a status of at least one protection system associated with the power network.

### Claim 14 (depends on 13)

The method of claim 13, wherein the two buses comprise a point of interconnection bus and a substation bus.

### Claim 15 (depends on 13)

The method of claim 13, wherein the short-circuit ratio is determined at a medium voltage bus.

### Claim 16 (depends on 12)

The method of claim 12 wherein identifying a predetermined natural voltage level of the power network that corresponds to the measured active power output comprises comparing the measured active power output to a pre-populated look-up table, identifying a corresponding entry in the look-up table and reading the natural voltage level of the power network based on the identified entry in the look-up table.

### Claim 17 (depends on 16)

The method of claim 16 comprising determining a parameter selected from the following: a short-circuit ratio; a phase angle difference between two buses forming part of the power network; and a status of at least one protection system associated with the power network, and wherein identifying a predetermined natural voltage level of the power network that corresponds to the measured active power output comprises comparing the measured active power output and the determined parameter with the look-up table, identifying a corresponding entry in the look-up table and reading the natural voltage level of the power network based on the identified entry in the look-up table.

### Claim 18 (depends on 12)

The method of claim 12, wherein the method is performed following a fault in the power network.

### Claim 19 (depends on 12)

The method of claim 12, wherein the first bus is a point of interconnection bus.

### Claim 20

A power plant controller for a power plant having a plurality of wind turbine generators, wherein the controller comprises a processor, a memory module, and an input/output system, and wherein the memory includes a set of program code instructions which when executed by the processor, implement an operation, comprising:
identifying a predetermined voltage condition of the power plant or of a bus connecting the power plant to a wider power network;
performing an operation iteratively until an end condition is detected, wherein the operation comprises:
controlling the power plant to maintain zero reactive power exchange at the bus for a first period;
calculating an average voltage level of the bus that was achieved during the first period; and
controlling the power plant to maintain a voltage output at a set voltage level for a second period, the set voltage level being substantially equal to the calculated average voltage level, wherein a duration of the second period is reduced between a pair of consecutive iterations of the operation; and
reverting to a previous control mode when the end condition is detected.