# US 11,441,989 B1 · Method and apparatus for carrying out rheologic measurements of a drilling mud

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,441,989 B1
- Document ID: US11441989B1
- Status: Granted
- Kind: B1
- Application number: 17/679,157
- Filed: 2020-02-24
- Published: 2022-09-01
- Granted: 2022-09-13
- Earliest claimed: 2020-02-24
- Assignees: Geolog S.r.l.
- Applicants: Geolog S.r.l.
- Inventors: Antonio Calleri
- Web page: https://patentgrep.com/patent/US11441989B1

## CPC

- G01N 11/04: through a restricted passage, e.g. tube, aperture
- G01N 11/10: by moving a body within the material
- G01N 33/2823: {Raw oil, drilling fluid or polyphasic mixtures}
- H01F 7/20: without armatures (cores H01F3/00; coils H01F5/00 {; shaping metal by applying magnetic forces B21D26/14; electromagnets specially adapted for NMR applications G01R33/381})
- H01F 27/28: Coils; Windings; Conductive connections
- G01N 2011/147: {Magnetic coupling}
- G01N: INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES (measuring or testing apparatus or processes other than immunoassay, involving enzymes or microorganisms C12M, C12Q)
- H01F: MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES

## Abstract

Method for carrying out rheologic measurements of a drilling mud, comprising: providing a first toroidal conduit (10); inserting into said first toroidal conduit (10) a drilling mud, comprising drilling debris; determining conditions to be simulated for said mud, said conditions to be simulated comprising a path length and/or a flow time to be simulated for said mud; determining, as a function of said conditions to be simulated, operating conditions to be applied to said mud, said operating conditions comprising a number of laps around said first toroidal conduit (10) and/or a flow time in said first toroidal conduit (10); regulating the temperature inside said first toroidal conduit (10); regulating the pressure inside said first toroidal conduit (10); providing a displacement device (20) comprising a first projectile (21), wherein said first projectile (21) fills substantially entirely a cross-section of said first toroidal conduit (10); moving, by means of said first projectile (21), said mud in the first annular conduit (10) according to said operating conditions. The method further comprises: a first operating step, wherein a force is determined, which is applied by said displacement device (20) to move said mud in the first toroidal conduit (10); a second operating step, wherein a rheologic parameter of said mud is determined as a function of said force.

## Claims

### Claim 1

Method for carrying out rheologic measurements of a drilling mud, comprising:
providing a first toroidal conduit;
inserting into said first toroidal conduit a drilling mud, comprising drilling debris;
determining conditions to be simulated for said mud, said conditions to be simulated comprising a path length and/or a flow time to be simulated for said mud;
determining, as a function of said conditions to be simulated, operating conditions to be applied to said mud, said operating conditions comprising a number of laps along said first toroidal conduit and/or a flow time in said first toroidal conduit;
regulating the temperature inside said first toroidal conduit;
regulating the pressure inside said first toroidal conduit;
providing a displacement device comprising a first projectile, wherein said first projectile fills substantially entirely a cross-section of said first toroidal conduit;
moving, by means of said first projectile, said mud in the first annular conduit according to said operating conditions;
said method further comprising:
a first operating step, wherein a force is determined, which is applied by said displacement device to move said mud in the first toroidal conduit;
a second operating step, wherein a rheologic parameter of said mud is determined as a function of said force.

### Claim 2 (depends on 1)

Method according to claim 1, wherein said first and second operating steps are carried out at least after said operating conditions have been applied.

### Claim 3 (depends on 1)

Method according to claim 1, wherein said force corresponds to a torque that said displacement device applies to keep said mud flowing at a predetermined velocity.

### Claim 4 (depends on 3)

Method according to claim 3, wherein said rheologic parameter is determined as a function of said torque.

### Claim 5 (depends on 1)

Method according to claim 1, wherein said rheologic parameter comprises a viscosity of said mud.

### Claim 6 (depends on 1)

Method according to claim 1, wherein the pressure inside said first toroidal conduit is in the range of 1 bar to 200 bar, preferably 10 bar to 170 bar.

### Claim 7 (depends on 1)

Method according to claim 1, wherein the temperature inside said first toroidal conduit is in the range of 4° C. to 200° C., preferably 10° C. to 160° C.

### Claim 8

Apparatus for carrying out rheologic measurements of a drilling mud comprising drilling debris, said apparatus comprising:
a first toroidal conduit;
a first regulation system for regulating the temperature inside said first toroidal conduit;
a second regulation system for regulating the pressure inside said first toroidal conduit;
a displacement device comprising a first projectile, wherein said first projectile fills substantially entirely a cross-section of said first toroidal conduit, said first projectile being configured for moving said drilling mud inside said first toroidal conduit according to operating conditions determined on the basis of conditions to be simulated for said mud, wherein said conditions to be simulated comprise a path length and/or a flow time to be simulated for said mud, and said operating conditions comprise a number of laps along said first toroidal conduit and/or a flow time in said toroidal conduit;
a processing unit, associated with said displacement device and configured for:
determining a force exerted by said displacement device in order to move the mud in said first toroidal conduit;
determining a rheologic parameter of said mud as a function of said force.

### Claim 9 (depends on 8)

Apparatus according to claim 8, wherein said processing unit is configured for:
verifying that said operating conditions have been applied;
after performing said verification, determining the force applied by said displacement device for moving the mud in the first toroidal conduit;
determining said rheologic parameter as a function of said force.

### Claim 10 (depends on 8)

Apparatus according to claim 8, wherein said displacement device comprises:
an active element, external to said first toroidal conduit and magnetically coupled to said first projectile;
a main actuator connected to said active element and configured for moving the latter along the first toroidal conduit.

### Claim 11 (depends on 8)

Apparatus according to claim 8, wherein said projectile is made of oriented magnetic material, and said displacement device comprises:
one or more windings arranged around said first toroidal conduit;
a control unit, connected to said one or more windings and configured to cause a determined current to flow in said one or more windings, said determined current generating a magnetic field adapted to move said first projectile.

### Claim 12 (depends on 11)

Apparatus according to claim 11, wherein said control unit is connected to said processing unit, said processing unit being configured to determine said rheologic parameter as a function of the applied current.

### Claim 13 (depends on 8)

Apparatus according to claim 8, wherein said first regulation system comprises at least one of:
a sleeve externally associated with said first annular conduit, a thermovector fluid and a regulation module for regulating the temperature of said thermovector fluid, and
one or more Peltier cells externally applied to said first toroidal conduit, and an electric circuit associated with said one or more Peltier cells in order to supply power thereto.

### Claim 14 (depends on 8)

Apparatus according to claim 8, wherein said first toroidal conduit has an aperture, which can be selectively closed, for inserting said mud into said first toroidal conduit.

### Claim 15 (depends on 14)

Apparatus according to claim 14, comprising a closing element coupled to said aperture and drivable between a first condition, in which it sealingly closes said aperture, and a condition in which it opens, at least partially, said aperture.

### Claim 16 (depends on 8)

Apparatus according to claim 8, comprising a second toroidal conduit, in selective fluidic communication with said first toroidal conduit, wherein said second toroidal conduit has substantially the same inner volume as said first toroidal conduit, and a different diameter and cross-sectional area compared to said first toroidal conduit.

### Claim 17 (depends on 16)

Apparatus according to claim 16, wherein said displacement device is configured for moving said mud in said second toroidal conduit, so that said mud will flow in said second toroidal conduit.

### Claim 18 (depends on 16)

Apparatus according to claim 16, wherein said displacement device comprises a second projectile housed inside said second toroidal conduit.

### Claim 19 (depends on 18)

Apparatus according to claim 18, wherein said main actuator is also coupled to said second projectile.

### Claim 20 (depends on 18)

Apparatus according to claim 18, wherein said displacement device comprises an auxiliary actuator coupled to said second projectile for moving said second projectile inside said second toroidal conduit.

### Claim 21 (depends on 10)

Apparatus according to claim 10, wherein said displacement device comprises a pump, preferably an electric-type volumetric pump, adapted to act upon said mud in order to move the same at least inside said first toroidal conduit.