# US 11,440,265 B2 · Method for the additive production of a three-dimensional object

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,440,265 B2
- Document ID: US11440265B2
- Status: Granted
- Kind: B2
- Application number: 15/840,173
- Filed: 2017-12-13
- Published: 2018-06-14
- Granted: 2022-09-13
- Earliest claimed: 2016-12-14
- Assignees: Concept Laser GmbH
- Applicants: Cl Schutzrechtsverwaltungs GmbH
- Inventors: Matthias Hofmann
- Web page: https://patentgrep.com/patent/US11440265B2

## CPC

- B29C 64/40: Structures for supporting 3D objects during manufacture and intended to be sacrificed after completion thereof
- B22F 10/28: Powder bed fusion, e.g. selective laser melting [SLM] or electron beam melting [EBM]
- B22F 10/43: characterised by material
- B22F 10/47: characterised by structural features
- B29C 64/153: using layers of powder being selectively joined, e.g. by selective laser sintering or melting
- B33Y 10/00: Processes of additive manufacturing
- B22F 12/49: Scanners
- B22F 12/67: Blades
- B33Y 70/00: Materials specially adapted for additive manufacturing
- Y02P 10/25: Process efficiency
- B29C: SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING (making preforms B29B11/00; making laminated products by combining previously unconnected layers which become one product whose layers will remain together B32B37/00 - B32B41/00)
- B22F: WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER (making alloys by powder metallurgy C22C); APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Method for the additive production of a three-dimensional object (2) by selective exposure in successive layers and associated selective consolidation in successive layers of construction material layers composed of a construction material (3) that can be consolidated by means of an energy beam (4), wherein, as part of the additive production of the three-dimensional object (2) to be produced additively, a supporting structure (11) directly surrounding the three-dimensional object (2) produced or to be produced additively is formed by selective exposure in successive layers and associated selective pre-consolidation in successive layers of construction material layers composed of the construction material (3) that can be consolidated by means of the energy beam (4).

## Claims

### Claim 1

A method for an additive production of a three-dimensional object by a selective exposure in successive layers and an associated selective consolidation in the successive layers of construction material layers composed of a construction material that can be consolidated with an energy beam, the method comprising:
producing, as part of the additive production of the three-dimensional object to be produced additively, a supporting structure directly surrounding the three-dimensional object the supporting structure produced or to be produced additively is formed by the selective exposure in the successive layers and an associated selective pre-consolidation in the successive layers of the construction material layers composed of the construction material that can be consolidated with the energy beam;
performing the selective consolidation of the construction material in the successive layers to form the three-dimensional object with a first degree of consolidation of the construction material; and
performing the selective pre-consolidation of the construction material in the successive layers to form the supporting structure with a second degree of consolidation of the construction material, the second degree of consolidation of the construction material having a lesser degree of consolidation than that of the first degree of consolidation of the construction material;
wherein the selective consolidation of the construction material in the successive layers to form the three-dimensional object is performed by a complete melting and a subsequent cooling of the construction material such that the construction material undergoes a solid-liquid phase transition, and the selective pre-consolidation of the construction material in the successive layers to form the supporting structure is performed by an incomplete melting and/or sintering of the construction material such that the construction material does not undergo the solid-liquid phase transition, resulting in removal of the supporting structure from the three-dimensional object via spontaneous crumbling during a process of unpacking the three-dimensional object.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the second degree of consolidation of the construction material results in a supporting structure of a lower strength than that of the three-dimensional object.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the supporting structure is porous, at least in some section or sections.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the selective pre-consolidation of the construction material in the successive layers to form the supporting structure is performed by a selective introduction of a radiant energy.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the supporting structure is formed with a plurality of interconnected or a plurality of non-interconnected supporting structure sections.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the supporting structure is formed with a cuboidal geometrical shape surrounding the three-dimensional object produced or to be produced additively, or the supporting structure is formed with a geometrical shape which follows the contour, in particular the outer and/or inner contour, of the three-dimensional object produced or to be produced additively.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the supporting structure is formed completely or sectionally surrounding the three-dimensional object produced or to be produced additively.

### Claim 8 (depends on 1)

The method according to claim 1, wherein the selective exposure in the successive layers and the associated selective pre-consolidation in the successive layers of the construction material layers composed of the construction material that can be consolidated with the energy beam is performed based on construction data related to the supporting structure, wherein the construction data related to the supporting structure are produced based on object-related construction data.

### Claim 9

A device for the additive production of the three-dimensional object by the selective exposure in the successive layers and the associated selective consolidation in the successive layers of the construction material layers composed of the construction material that can be consolidated with the energy beam, wherein the device is configured to carry out the method according to one of the preceding claims.

### Claim 10 (depends on 1)

The method according to claim 1, wherein the selective pre-consolidation of the construction material heats the construction material to a temperature below the melting temperature of the construction material.

### Claim 11 (depends on 1)

The method according to claim 1, wherein the selective consolidation of the construction material in the successive layers to form the three-dimensional object is performed with a first exposure unit, and the selective pre-consolidation of the construction material in the successive layers to form the supporting structure is performed with a second exposure unit having at least one different exposure parameter from that of the first exposure unit.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the construction material is a particulate or pulverulent metal, plastics, and/or ceramic material.

### Claim 13 (depends on 8)

The method according to claim 8, wherein the construction data contains CAD data of the three-dimensional object.

### Claim 14 (depends on 1)

The method according to claim 1, wherein at least some section or sections of the three-dimensional object or all of the three dimensional-object is embedded in the supporting structure.

### Claim 15 (depends on 1)

The method according to claim 1, wherein at least sectional or complete direct mechanical contact exists between the three-dimensional object and the supporting structure.

### Claim 16 (depends on 11)

The method according to claim 11, wherein the first exposure unit and the second exposure unit differ in power.

### Claim 17 (depends on 11)

The method according to claim 11, wherein the at least one different exposure parameter is at least one of an intensity of exposure and a shorter exposure time.

### Claim 18 (depends on 1)

The method according to claim 1, wherein the supporting structure has a lower density and a lower strength than that of the three-dimensional object.

### Claim 19 (depends on 9)

The device according to claim 9, wherein the device is a selective laser melting device configured for use in selective laser melting methods.

### Claim 20 (depends on 9)

The device according to claim 9, wherein the device is a selective laser sintering device configured for use in selective laser sintering methods.
