Method for operating electrical machines
AssigneeNordex Energy Spain, S.A.
InventorsTeresa Arlabán Gabeiras, Jose Miguel García Sayés, Ricardo Royo García, Miguel Núñez Polo
Life of this patent
Estimating the term…
Abstract
A solution to optimally manage those requirements ensuring on the one hand, that the requirements set by the grid operators are appropriately and accurately accomplished at a point of interconnection (POI) and on the other hand, preventing the wind turbines from over fulfilling the requirements, for example, by remaining connected at voltages levels higher or lower than the ones required which, although possible, may cause higher loads and currents in the wind turbines than needed to fulfill the requirements.
Claims17
A method for operating a plurality of wind turbines, said method comprising:
- coupling each wind turbine of the plurality of wind turbines to an electric power system such that the electric power system is configured to transmit at least one phase of electric power to the respective wind turbine;
- and
- configuring each wind turbine such that the respective wind turbine remains electrically connected to the electric power system during and subsequent to a voltage amplitude of the electric power system operating outside of a predetermined range for an undetermined period of time, wherein configuring each wind turbine comprises:
- electrically coupling at least a portion of a control system of each respective wind turbine to at least a portion of the electric power system;
- coupling each control system in electronic data communication with at least a portion of the respective wind turbine;
- and
- configuring each wind turbine and the respective control system such that:
- i. each wind turbine remains electrically connected to the electric power system during and subsequent to the voltage amplitude of the electric power system, as obtained at terminals of the respective wind turbine, decreasing below the predetermined range but remaining above a first voltage threshold for the respective wind turbine indicative of a fault within a wind farm electric system of which the plurality of wind turbines is a part for the undetermined period of time and
- ii. each control system is further configured to at least partially disconnect the respective wind turbine from the electric power system when the voltage amplitude of the electric power system, as obtained at the terminals of the respective wind turbine, decreases below the first voltage threshold for the respective wind turbine;
- wherein the first voltage threshold for the respective wind turbine is part of a voltage versus time curve that comprises per unity voltage values at the terminals of the respective wind turbine, the per unity voltage values at the terminals corresponding to, but differing from, per unity voltage value limits for a point of interconnection between the wind farm electric system and an external electric grid as set by an operator of the electric power system,
- wherein the first voltage threshold for each wind turbine may differ from the first voltage threshold for each other wind turbine in the plurality of wind turbines, and
- wherein the first voltage threshold for a respective wind turbine is calculated based on a minimum voltage level at the point of interconnection (POI) at which a grid operator requires each wind turbine to remain connected and an impedance between the respective wind turbine terminals and the point of interconnection.
A wind farm electric system comprising a plurality of wind turbines comprising:
- each wind turbine of the plurality of wind turbines coupled to an electric power system such that the electric power system is configured to transmit at least one phase of electric power to the respective wind turbine;
- and
- wherein each wind turbine is configured such that the respective wind turbine remains electrically connected to the electric power system during and subsequent to a voltage amplitude of the electric power system operating outside of a predetermined range for an undetermined period of time, wherein:
- at least a portion of a control system of each respective wind turbine is electrically coupled to at least a portion of the electric power system;
- each control system is coupled in electronic data communication with at least a portion of the respective wind turbine;
- and
- each wind turbine and the respective control system are also configured such that
- i. each wind turbine remains electrically connected to the electric power system during and subsequent to the voltage amplitude of the electric power system, as obtained at terminals of the respective wind turbine, decreasing below the predetermined range but remaining above a first voltage threshold for the respective wind turbine indicative of a fault within a wind farm electric system of which the plurality of wind turbines is a part for the undetermined period of time and
- ii. each wind turbine is at least partially disconnected from the electric power system by means of the respective control system when the voltage amplitude of the electric power system, as obtained at the terminals of the respective wind turbine, decreases below the first voltage threshold for the respective wind turbine;
- wherein the first voltage threshold for the respective wind turbine is part of a voltage versus time curve that comprises per unity voltage values at the terminals of the respective wind turbine, the per unity voltage values at the terminals of the respective wind turbine corresponding to, but differing from, per unity voltage value limits for a point of interconnection between the wind farm electric system and an external electric grid as set by an operator of the electric power system,
- wherein the first voltage threshold for each wind turbine may differ from the first voltage threshold for each other wind turbine in the plurality of wind turbines, and
- wherein each control system is also configured to calculate the first voltage threshold for the respective wind turbine based on a minimum voltage level at the point of interconnection (POI) at which a grid operator requires the respective wind turbine to remain connected and an impedance between the respective wind turbine terminals and the point of interconnection.
A method for operating a plurality of wind turbines, said method comprising:
- coupling each wind turbine of the plurality of wind turbines to an electric power system such that the electric power system is configured to transmit at least one phase of electric power to the respective wind turbine;
- and
- configuring each wind turbine such that the respective wind turbine remains electrically connected to the electric power system during and subsequent to a voltage amplitude of the electric power system operating outside of a predetermined range for an undetermined period of time, wherein configuring each wind turbine comprises:
- electrically coupling at least a portion of a control system of each respective wind turbine to at least a portion of the electric power system;
- coupling each control system in electronic data communication with at least a portion of the respective wind turbine;
- and
- configuring each wind turbine and the respective control system such that:
- i. each wind turbine remains electrically connected to the electric power system during and subsequent to the voltage amplitude of the electric power system, as obtained at terminals of the respective wind turbine, decreasing below the predetermined range but remaining above a first voltage threshold for the respective wind turbine indicative of a fault within a wind farm electric system of which the plurality of wind turbines is a part for the undetermined period of time and
- ii. each control system is further configured to at least partially disconnect the respective wind turbine from the electric power system when the voltage amplitude of the electric power system, as obtained at the terminals of the respective wind turbine, decreases below the first voltage threshold for the respective wind turbine;
- wherein the first voltage threshold for the respective wind turbine is part of a voltage versus time curve that comprises per unity voltage values at the terminals of the respective wind turbine, the per unity voltage values at the terminals corresponding to, but differing from, per unity voltage value limits for a point of interconnection between the wind farm electric system and an external electric grid as set by an operator of the electric power system,
- wherein the first voltage threshold for each wind turbine may differ from the first voltage threshold for each other wind turbine in the plurality of wind turbines, and
- wherein the first voltage threshold for a respective wind turbine is predetermined by means of simulations prior to configuring the respective control system and according to theoretical models of the plurality of wind turbines, the wind farm electric system and of the external electric grid, and considering a zero voltage dip at the point of interconnection (POI).
Dependencies are inferred from the claim text.