Systems and methods for improving computational speed of planning by enabling interactive processing in hypercubes
AssigneeWorkday, Inc.
InventorsChristof Bornhoevd, Neil Thombre
Life of this patent
Estimating the term…
Loading patent…
AssigneeWorkday, Inc.
InventorsChristof Bornhoevd, Neil Thombre
Estimating the term…
A system for assigning a workload to compute resources includes an interface and a processor. The interface is configured to receive a workload. The processor is configured to break the workload into a set of subproblems; and for a subproblem of the set of subproblems: determine whether the subproblem benefits from intersheet parallelism; determine whether the subproblem benefits from intrasheet parallelism; determine whether the subproblem benefits from directed acyclic graph (DAG) partitioning; and assign the subproblem, wherein assigning the subproblem utilizes optimization when appropriate based at least in part on benefits from the intersheet parallelism, the intrasheet parallelism, and the DAG partitioning.
A system for assigning a workload to compute resources, comprising:
A method for assigning a workload to compute resources, comprising:
A computer program product for assigning a workload to compute resources, the computer program product being embodied in a non-transitory computer readable storage medium and comprising computer instructions for:
Dependencies are inferred from the claim text.