Dry dust removal from furnace gas
AssigneeDanieli Corus B.V.
InventorsWouter Bernd Ewalts, Pieter Dirk Klut
Life of this patent
Estimating the term…
Abstract
A process and a plant for cleaning furnace gas includes utilizing one or more sensors to continuously monitor one or more parameters indicative for an expected temperature peak in the blast furnace gas flow. The gas flow is then passed through a conditioning tower. In case the measured parameter exceeds a predefined limit value, a coolant, such as water, is sprayed into the blast furnace gas flow in the conditioning tower. Subsequently the flow of blast furnace gas passes one or more filter stations.
Claims20
A process for cleaning blast furnace gas flowing from a blast furnace via a dust removing device to one or more filter stations, comprising:
- continuously monitoring, with one or more sensors, one or more parameters indicative of a temperature peak in the blast furnace gas flow;
- in case the one or more parameters exceeds a predefined limit value, spraying a coolant into the blast furnace gas flow;
- after passing the blast furnace gas through the dust removing device to remove some dust particles from the blast furnace gas and before passing the one or more filter stations, flowing the blast furnace gas from an outlet of the dust removing device through a gas discharge line to an inlet at a top section of a conditioning tower that is separate from the dust removing device;
- flowing the blast furnace gas as a uniform and non-turbulent flow downward through the conditioning tower to a blast furnace gas outlet below the inlet and at or near a bottom of the conditioning tower;
- spraying the coolant through nozzles co-currently or counter-currently into the blast furnace gas flow through the conditioning tower, wherein during a residence time in the conditioning tower the coolant evaporates before the blast furnace gas passes the blast furnace gas outlet in the conditioning tower;
- and
- collecting dust from the blast furnace gas in the conditioning tower separate from dust collected from the dust removing device.
A plant for the production of steel or iron, the plant comprising:
- a blast furnace with an off-take for blast furnace gas;
- a dust removing device connected to the off-take to receive blast furnace gas through a dust removing device inlet and discharge blast furnace gas through a dust removing device outlet;
- a gas discharge line connected to the dust removing device outlet;
- one or more filter stations;
- one or more sensors configured to continuously monitor one or more parameters indicative of a temperature in the blast furnace gas flow;
- nozzles connected to a coolant supply line;
- a conditioning tower separate from the dust removing device and comprising a blast furnace gas inlet at a top section of the conditioning tower connected to the gas discharge line and a blast furnace gas outlet below the blast furnace gas inlet at or near a bottom of the conditioning tower, the blast furnace gas outlet leading to the one or more filter stations, wherein the conditioning tower comprises the nozzles, the nozzles configured to inject coolant in a flow direction or in a counter-flow direction of the blast furnace gas, wherein a distance between the nozzles and the blast furnace gas outlet of the conditioning tower is configured to allow full evaporation of the coolant during a residence time of the blast furnace gas in the conditioning tower, and wherein the conditioning tower is configured to collect dust separate from dust collected by the dust removing device.
An assembly for processing blast furnace gas, the assembly comprising:
- a dust removing device connected to off-take to receive blast furnace gas through a dust removing device inlet and discharge blast furnace gas through a dust removing device outlet;
- a gas discharge line connected to the dust removing device outlet;
- one or more sensors configured to continuously monitor one or more parameters indicative of a temperature in the blast furnace gas flow;
- nozzles connected to a coolant supply line;
- and
- a conditioning tower separate from the dust removing device and comprising a blast furnace gas inlet at a top section of the conditioning tower connected to the gas discharge line and a blast furnace gas outlet below the blast furnace gas inlet at or near a bottom of the conditioning tower, wherein the conditioning tower is configured to provide non-turbulent blast furnace gas flow therein, wherein the conditioning tower comprises the nozzles, the nozzles configured to inject coolant in a flow direction or in a counter-flow direction of the blast furnace gas, wherein a distance between the nozzles and the blast furnace gas outlet of the conditioning tower is configured to allow full evaporation of the coolant during a residence time of the blast furnace gas in the conditioning tower, and wherein the conditioning tower is configured to collect dust separate from dust collected by the dust removing device.
Dependencies are inferred from the claim text.