US 11,386,247 B2Granted
Method for designing for induction time using supplementary cementitious materials
AssigneeHalliburton Energy Services, Inc.
InventorsJohn Paul Bir Singh, Thomas Jason Pisklak, Ronnie Glen Morgan, Siva Rama Krishna Jandhyala, Krishna Babu Yerubandi
Life of this patent
Estimating the term…
Abstract
A method may include: providing a model of cement induction time; designing a cement composition, based at least partially, on the model of cement induction time; and preparing the cement composition.
Claims19
A method comprising:
- providing a model of cement induction time, wherein the model of cement induction time comprises a regression model of induction time data and physicochemical data;
- designing a proposed cement composition, based at least partially, on the model of cement induction time;
- preparing the proposed cement composition;
- modifying the proposed cement composition to produce a modified cement composition if a predicted induction time of the proposed cement composition does not meet or exceed a target induction time;
- calculating the predicted induction time of the modified cement composition using the model of cement induction time;
- comparing the predicted induction time of the modified cement composition to the target induction time;
- and
- preparing the modified cement composition if the predicted induction time of the modified cement composition meets or exceeds the target induction time.
5 more elements
A method comprising:
- providing a plurality of cementitious components;
- generating a design of a cement composition, wherein the cement composition comprises one or more cementitious components selected from the plurality of cementitious components;
- calculating a predicted model parameter using a model of induction time, wherein the model of induction time comprises a regression model of induction time data and physicochemical data;
- comparing the predicted model parameter of the cement composition to a design parameter, wherein the design parameter is at least one of induction time requirement, thickening time, and compressive strength time requirement;
- and
- preparing the cement composition if the predicted design parameter meets or exceeds the design parameter.
3 more elements
A method comprising:
- generating a proposed cement slurry comprising two or more cementitious components;
- inputting physicochemical properties of the two or more cementitious components into a model of cement induction time, wherein the model comprises a regression model of induction time data and physicochemical data to output a predicted cement induction time at a downhole temperature and pressure;
- iteratively modifying the proposed cement slurry until the predicted cement induction an induction time requirement is met or exceeded;
- preparing the proposed cement slurry;
- measuring an induction time of the proposed cement slurry;
- and
- comparing the measured induction time of the proposed cement slurry to determine if the measured induction time meets or exceeds the induction time requirement.
4 more elements
Dependencies are inferred from the claim text.