System and method for improving startup time in a fossil-fueled power generation system
AssigneeGeneral Electric Company
InventorsBernard Walsh, Ronald Nowak, Bryan Mruk
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Company
InventorsBernard Walsh, Ronald Nowak, Bryan Mruk
Estimating the term…
A system for reheating a power generation system including a boiler having a waterwall and a steam drum with an input fluidly coupled to the waterwall and an auxiliary heat source to provide heated fluid. The system also includes a first flow control valve connected to the auxiliary heat source and the boiler to control a flow of heated fluid from the auxiliary heat source to the waterwall; a first isolation valve disposed at a waterwall, to isolate circulation of heated fluid from the steam drum to the waterwall; and a sensor to monitor at least one operating characteristic in the boiler. The system also includes a controller to control at least one of the flow control valve, the isolation valve, and the auxiliary heat source to control the amount of heated fluid supplied to the waterwall when the boiler is not generating steam.
A system for preheating a steam driven power generation system, comprising:
A system for preheating a power generation system, comprising:
A method of preheating a power generation system, the power generation system having a boiler system including a main boiler and a combustion system, the boiler system operative to generate steam when the combustion system is operating, the main boiler having a waterwall and a steam drum located at a top region of the waterwall, the steam drum having an input fluidly coupled to the waterwall, the method comprising:
Dependencies are inferred from the claim text.