Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
AssigneeS&P Clever Reinforcement Company AG
InventorsMasoud Motavalli, Elyas Ghafoori
Life of this patent
Estimating the term…
Loading patent…
AssigneeS&P Clever Reinforcement Company AG
InventorsMasoud Motavalli, Elyas Ghafoori
Estimating the term…
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
A steel structure having at least one reinforced steel girder, comprising:
A method of reinforcing at least one steel girder configured for bearing loads and bending moments in a steel structure comprising:
A method of reinforcing steel girders configured for bearing loads and bending moments in a steel structure comprising:
Dependencies are inferred from the claim text.