Back to results
US 11,285,980 B2Granted
Speed proving method and apparatus
AssigneeRail Control Systems Australia Pty Ltd
InventorNeil Popplewell
Life of this patent
Estimating the term…
Abstract
The present invention relates to methods of improving the reliability and accuracy of level crossing warning systems. The invention is comprised of an axle counter based system that detects the presence and calculates the speed of a train approaching a level crossing and adjusts the activation time for any warning system using a pre-defined period.
Claims15
A method of delaying activation of a warning system of a level crossing configured to assume a maximum speed of an approaching train and calculate an estimated arrival time for activating the level crossing therefrom, the method comprising:
- (a) detecting the presence of an approaching train having a plurality of axles, wherein a first axle speed for a primary axle of the train is detected by passing over a first axle counting wheel sensor positioned at a first distance from the level crossing;
- (b) detecting the presence of the approaching train wherein a second speed for the primary axle of the train is detected by a second axle counting wheel sensor positioned at a second distance from the level crossing;
- (c) measuring the time taken for the primary axle to travel between the first axle counting wheel sensor and the second axle counting wheel sensor to calculate an average primary axle speed for the primary axle of the train;
- (d) comparing the detected second axle speed to the average primary axle speed to assess whether the detected second axle speed is determined valid or determined fail and,
- where if the detected second axle speed of the primary axle is determined valid;
- (e) calculating an arrival time for the train at the level crossing based on the second detected axle speed of the primary axle;
- and
- (f) determining a maximum safe delay for activating the warning system of the level crossing based on the difference between the calculated arrival time of the train and the estimated arrival time.
5 more elements
Dependencies are inferred from the claim text.