Back to results
US 11,251,744 B1Granted
Photovoltaic shingles and methods of installing same
AssigneeGAF Energy LLC
InventorsGabriela Bunea, Thierry Nguyen, Michael David Kuiper, Evan Michael Wray, Lewis Abra, Peter Clemente, Brian West
Life of this patent
Estimating the term…
Abstract
A system includes a plurality of photovoltaic shingles installed on a roof deck, each of the shingles having a first layer including a head lap portion, and a second layer including at least one solar cell. A first photovoltaic shingle overlays at least a part of the head lap portion of a second photovoltaic shingle. The system includes at least one wireway installed proximate to a first end of at least the first photovoltaic shingle.
Claims9
A system, comprising:
- a roof deck;
- at least three photovoltaic shingles installed on a slope of the roof deck,
- wherein a first photovoltaic shingle of the at least three photovoltaic shingles is horizontally adjacent to a second photovoltaic shingle of the at least three photovoltaic shingles,
- wherein a third photovoltaic shingle of the at least three photovoltaic shingles is vertically adjacent to the first photovoltaic shingle,
- wherein each of the first photovoltaic shingle, the second photovoltaic shingle, and the third photovoltaic shingle includes:
- a first end, a second end opposite the first end, a first edge extending from the first end to the second end, and a second edge opposite the first edge and extending from the first end to the second end,
- wherein the first ends of the first and third photovoltaic shingles are substantially aligned with each other,
- wherein the second ends of the first and third photovoltaic shingles are substantially aligned with each other,
- a first layer including
- a head lap portion, and
- a step flap located at the first end, wherein the step flap includes a length extending from the first end to a location between the first end and the second end,
- wherein the head lap portion extends from the first end to the second end and from the first edge to a location between the first edge and the second edge,
- a second layer overlaying the first layer,
- wherein the second layer includes at least one solar cell, and
- wherein the first photovoltaic shingle overlays at least a part of the head lap portion of the third photovoltaic shingle, wherein the second photovoltaic shingle overlays at least a part of the step flap of the first photovoltaic shingle;
- and
- at least one wireway installed proximate to the first end of at least the first photovoltaic shingle.
14 more elements
Dependencies are inferred from the claim text.