Automated real-time transport ratio calculation
AssigneeSaudi Arabian Oil Company
InventorsMohammed Murif Al-Rubaii, Abdullah Saleh Hussain Al-Yami, Salem H. Al Gharbi
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsMohammed Murif Al-Rubaii, Abdullah Saleh Hussain Al-Yami, Salem H. Al Gharbi
Estimating the term…
Methods, systems, and computer-readable medium to perform operations including determining, in real-time, values of drilling parameters of a drilling system drilling a wellbore. The operations further include calculating, based on the values of the drilling parameters, a cuttings concentration in an annulus of the wellbore (CCA). Further, the operations include calculating, based on the calculated CCA and a mud weight (MW) of a drilling fluid, an effective mud weight (MWeff) of the drilling fluid. Yet further, the operations include calculating, based on the effective mud weight, a slip velocity of the cuttings. In addition, the operations include calculating, based on the slip velocity, a transport ratio (TR) of the cuttings.
A computer-implemented method comprising:
A non-transitory computer-readable medium storing one or more instructions executable by a computer system to perform operations comprising:
A computer-implemented system, comprising:
Dependencies are inferred from the claim text.