Secondary battery system and method of estimating stress of active material of secondary battery
AssigneeToyota Jidosha Kabushiki Kaisha
InventorKenji Takahashi
Life of this patent
Estimating the term…
Loading patent…
AssigneeToyota Jidosha Kabushiki Kaisha
InventorKenji Takahashi
Estimating the term…
A secondary battery system includes an electronic control unit (ECU) that estimates surface stress generated in a negative-electrode active material upon incorporation or removal of lithium in a negative electrode of a battery assembly. The ECU calculates an estimated value of the surface stress from a difference obtained by subtracting a reference lithium amount from an amount of lithium contained in the negative-electrode active material, using a linear relationship between the difference and the surface stress. The ECU sets the surface stress to yield stress when the magnitude of the estimated value is larger than that of the yield stress (compressive stress or tensile stress) of the active material, and employs the estimated value as the surface stress when the magnitude of the estimated value is smaller than that of the yield stress.
A secondary battery system comprising:
A method of estimating a stress generated in an active material of a secondary battery, as a charge carrier is incorporated into and is removed from the active material, comprising:
A secondary battery system comprising:
Dependencies are inferred from the claim text.