Methods to dehydrate a gravel pack and to temporarily increase a flow rate of fluid flowing from a wellbore into a conveyance are disclosed. A method to dehydrate gravel pack includes deploying a valve at a location proximate a gravel pack. The valve includes a rupture disk that ruptures in response to a threshold amount of pressure, and reactive fluid that actuates the valve to a closed position. The method also includes providing a fluid flow path from the gravel pack to the conveyance. The method further includes closing the valve after providing the fluid flow path from the gravel pack to the conveyance for a threshold period of time.
Drawings
Claims20
A method to dehydrate a gravel pack, the method comprising:
deploying a valve at a downhole location proximate to a gravel pack, the valve comprising:
a rupture disk that ruptures in response to a threshold amount of pressure;
reactive fluid;
and
a swellable elastomer;
rupturing the rupture disk, wherein the reactive fluid comes into contact with the swellable elastomer after the rupture disk is ruptured;
providing a fluid flow path from the gravel pack to a conveyance;
and
after providing the fluid flow path from the gravel pack to the conveyance for a threshold period of time, shifting a piston of the valve from a first position to a second position to close the valve, wherein the piston is shifted from the first position to the second position by an expansion of the swellable elastomer.
6 more elements
A method to temporarily increase a flow rate of fluid flowing from a wellbore into a conveyance, the method comprising:
deploying a valve at a location proximate to one or more fluid flow paths that fluidly connect a region of the wellbore to the conveyance, the valve initially providing an additional fluid flow path from the region of the wellbore to the conveyance, the valve comprising:
a rupture disk that ruptures in response to a threshold amount of pressure;
reactive fluid;
and
a swellable elastomer;
rupturing the rupture disk, wherein the reactive fluid comes into contact with the swellable elastomer after the rupture disk is ruptured;
and
after providing the additional fluid flow path from the region of the wellbore to the conveyance for a threshold period of time, shifting a piston of the valve from a first position to a second position to close the valve, wherein the piston is shifted from the first position to the second position by an expansion of the swellable elastomer.
4 Dec 2039Estimated · howhide20 years from earliest known nonprovisional domestic filing plus recorded patent term adjustment, including 71 days of adjustment. Maintenance-fee lapses, terminal disclaimers and statutory extensions have not been checked. The continuity chain may be incomplete; this is not an enforceability determination.
About 13 years 1 month of term left · ends 4 Dec 2039 (estimated)
Priority24 Sep 2019
Granted12 Oct 2021
Today12 Oct 2026
Term ends4 Dec 2039
Priority24 Sep 2019
Granted12 Oct 2021
Term ends4 Dec 2039
Application filedUS 16/581,003
Assigned to Halliburton Energy Services, Inc.assignment of assignor's interest
PublishedUS 2021/0087908 A1
GrantedUS 11,143,003 B2
TodayWithin its term
Term endsEstimated, includes 71 days of adjustment
Description7,324 words
Summary147 words
#The present disclosure relates generally to methods to dehydrate gravel pack and to temporarily increase a flow rate of fluid flowing from a wellbore into a conveyance.
#Gravel packing operations are often performed during completion operations to prevent production of formation sand or other undesirable particles. A gravel pack completion sometimes includes a sand screen that is deployed on a conveyance and at a position proximate to the desired production interval. A fluid slurry including a liquid carrier and a particulate material known as gravel is then pumped down the conveyance and into the well annulus formed between the sand control screen and a perforated well casing or open-hole production zone. Improper dehydration of gravel sometimes results in formation of loose gravel pack which causes the sand screen to become exposed due to settling from the loose-packed area. The exposed sand screen is susceptible to premature failure.
Brief description of the drawings10 figures
#The following figures are included to illustrate certain aspects of the present disclosure, and should not be viewed as exclusive embodiments. The subject matter disclosed is capable of considerable modifications, alterations, combinations, and equivalents in form and function, without departing from the scope of this disclosure.
#FIG. 1A illustrates a schematic view of an on-shore well having a valve deployed in a wellbore during well completion to dehydrate gravel pack and to temporarily increase a flow rate of fluid flowing from the wellbore into a conveyance;
#FIG. 1B illustrates a schematic view of an offshore platform having a valve deployed in a wellbore during well completion to dehydrate gravel pack and to temporarily increase a flow rate of fluid flowing from the wellbore into a conveyance;
Detailed description6,838 words
#The illustrated figures are only exemplary and are not intended to assert or imply any limitation with regard to the environment, architecture, design, or process in which different embodiments may be implemented.
#In the following detailed description of the illustrative embodiments, reference is made to the accompanying drawings that form a part hereof. These embodiments are described in sufficient detail to enable those skilled in the art to practice the invention, and it is understood that other embodiments may be utilized and that logical structural, mechanical, electrical, and chemical changes may be made without departing from the spirit or scope of the invention. To avoid detail not necessary to enable those skilled in the art to practice the embodiments described herein, the description may omit certain information known to those skilled in the art. The following detailed description is, therefore, not to be taken in a limiting sense, and the scope of the illustrative embodiments is defined only by the appended claims.
#The present disclosure relates to methods to dehydrate gravel pack and methods to temporarily increase a flow rate of fluid flowing from a wellbore into a conveyance. The method includes deploying a valve device (valve) to a location proximate one or more fluid flow paths that fluidly connect a gravel pack to a conveyance, where the valve initially provides a new fluid flow path from the gravel pack to the conveyance. As referred to herein, a conveyance may be a drill string, drill pipe, coiled tubing, production tubing, downhole tractor or another type of conveyance deployable in a wellbore. Further, as referred to herein, the valve is any device or component configured to initially provide a fluid flow path and is further configured to close the fluid flow path after a threshold period of time (e.g., 5 minutes, 10 minutes, 1 hour, or another desired or predetermined amount of time).