# US 11,121,385 B2 · Fuel cell purge systems and related processes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,121,385 B2
- Document ID: US11121385B2
- Status: Granted
- Kind: B2
- Application number: 16/686,275
- Filed: 2019-11-18
- Published: 2020-05-14
- Granted: 2021-09-14
- Earliest claimed: 2016-11-15
- Assignees: Teledyne Energy Systems, Inc.
- Applicants: Teledyne Energy Systems, Inc.
- Inventors: Robert K. Wynne; Patrick Scott Ferguson; Robert Christopher Utz
- Web page: https://patentgrep.com/patent/US11121385B2

## CPC

- H01M 8/04231: {Purging of the reactants}
- H01M 8/04179: {by purging or increasing flow or pressure of reactants}
- H01M 8/04291: Arrangements for managing water in solid electrolyte fuel cell systems (H01M8/04119 takes precedence)
- H01M 8/0662: Treatment of gaseous reactants or gaseous residues, e.g. cleaning
- H01M 2008/1095: {Fuel cells with polymeric electrolytes}
- H01M 2250/20: Fuel cells in motive systems, e.g. vehicle, ship, plane
- Y02E 60/50: Fuel cells
- Y02T 90/40: Application of hydrogen technology to transportation, e.g. using fuel cells
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

A fuel cell purge system includes a primary fuel cell in fluid communication with a purge cell. Fuel and oxidant purged with inert gas impurities from the primary fuel cell react in the purge cell, thereby decreasing the volume of purged gases and facilitating storage while maintaining fuel cell electrochemical performance.

## Claims

### Claim 1

A fuel cell purging process comprising:
transporting fuel and inert gas from a primary fuel line in a primary fuel cell to a fuel inlet on an anode side in a purge cell;
transporting oxidant and inert gas from a primary oxidant line in a primary fuel cell to an oxidant inlet on a cathode side in the purge cell;
reacting the fuel and the oxidant in the purge cell to produce anode products and cathode products; and
transporting the anode products, cathode products, and inert gas to at least one storage vessel.

### Claim 2 (depends on 1)

The fuel cell purging process of claim 1, further comprising controlling the transport of fuel and inert gas from the primary fuel line in the primary fuel cell to the fuel inlet using a fuel purge valve located in a fuel purge line.

### Claim 3 (depends on 1)

The fuel cell purging process of claim 1, further comprising controlling the transport of oxidant and inert gas from the primary oxidant line in the primary fuel cell to the oxidant inlet using an oxidant purge valve located in an oxidant purge line.

### Claim 4 (depends on 1)

The fuel cell purging process of claim 1, further comprising controlling the transport of anode products from the purge cell through an anode product line to an anode product storage vessel using an anode product valve located in the anode product line.

### Claim 5 (depends on 1)

The fuel cell purging process of claim 1, further comprising controlling the transport of cathode products from the purge cell through a cathode product line to a cathode product storage vessel using a cathode product valve located in the cathode product line.

### Claim 6 (depends on 1)

The fuel cell purging process of claim 1, further comprising driving the transport of anode products from the purge cell through the anode product line to the anode product storage vessel using an anode product pump located in the anode product line.

### Claim 7 (depends on 1)

The fuel cell purging process of claim 1, further comprising driving the transport of cathode products from the purge cell through the cathode product line to the cathode product storage vessel using a cathode product pump located in the cathode product line.

### Claim 8 (depends on 1)

The fuel cell purging process of claim 1, further comprising draining the anode products from the anode product storage vessel through an anode product drain line using an anode product drain valve, located in the anode product drain line.

### Claim 9 (depends on 1)

The fuel cell purging process of claim 1, further comprising draining the cathode products from the cathode product storage vessel through a cathode product drain line using a cathode product drain valve, located in the cathode product drain line.

### Claim 10 (depends on 1)

The fuel cell purging process of claim 1, further comprising:
venting fuel from the fuel purge line through a fuel vent line to a fuel vent; and
controlling the venting of fuel from the fuel purge line using a fuel vent valve located in the fuel vent line.

### Claim 11 (depends on 1)

The fuel cell purging process of claim 1, further comprising:
venting oxidant from the oxidant purge line through an oxidant vent line to an oxidant vent; and
controlling the venting of oxidant from the oxidant purge line using an oxidant vent valve located in the oxidant vent line.

### Claim 12

A fuel cell purging process comprising:
transporting hydrogen and inert gas from a primary hydrogen line in a primary closed loop proton exchange membrane fuel cell through a hydrogen purge line comprising a hydrogen purge valve, to a hydrogen inlet on an anode side of a secondary batch-operated proton exchange membrane fuel cell;
transporting oxygen and inert gas from a primary oxygen line in the primary closed-loop proton exchange membrane fuel cell through an oxygen purge line comprising an oxygen purge valve, to an oxygen inlet on a cathode side of the secondary batch-operated proton exchange membrane fuel cell;
reacting the hydrogen and the oxygen in the secondary batch-operated proton exchange membrane fuel cell to produce anode products and cathode products;
transporting the anode products through an anode product line comprising an anode product valve and an anode product pump, to an anode product storage vessel; and
transporting the cathode products through a cathode product line comprising a cathode product valve and a cathode product pump, to a cathode product storage vessel.

### Claim 13 (depends on 12)

The fuel cell purging process of claim 12, further comprising controlling the transport of hydrogen from the primary hydrogen line in the primary closed-loop proton exchange membrane fuel cell to the hydrogen inlet on the anode side of the secondary batch-operated proton exchange membrane fuel cell using the hydrogen purge valve located in a hydrogen purge line.

### Claim 14 (depends on 12)

The fuel cell purging process of claim 12, further comprising controlling the transport of oxygen from the primary oxygen line in the primary closed-loop proton exchange membrane fuel cell to the oxygen inlet on the cathode side of the secondary batch-operated proton exchange membrane fuel cell using the oxygen purge valve located in an oxygen purge line.

### Claim 15 (depends on 12)

The fuel cell purging process of claim 12, further comprising controlling the transport of anode products from the secondary batch-operated proton exchange membrane fuel cell through the anode product line to the anode product storage vessel using the anode product valve located in the anode product line.

### Claim 16 (depends on 12)

The fuel cell purging process of claim 12, further comprising controlling the transport of cathode products from the secondary batch-operated proton exchange membrane fuel cell through the cathode product line to the cathode product storage vessel using the cathode product valve located in the cathode product line.

### Claim 17 (depends on 12)

The fuel cell purging process of claim 12, further comprising driving the transport of anode products from the secondary batch-operated proton exchange membrane fuel cell through the anode product line to the anode product storage vessel using the anode product pump located in the anode product line.

### Claim 18 (depends on 12)

The fuel cell purging process of claim 12, further comprising driving the transport of cathode products from the secondary batch-operated proton exchange membrane fuel cell through the cathode product line to the cathode product storage vessel using a cathode product pump located in the cathode product line.

### Claim 19 (depends on 12)

The fuel cell purging process of claim 12, further comprising draining the anode products from the anode product storage vessel through an anode product drain line using an anode product drain valve, located in the anode product drain line.

### Claim 20 (depends on 12)

The fuel cell purging process of claim 12, further comprising draining the cathode products from the cathode product storage vessel through a cathode product drain line using a cathode product drain valve, located in the cathode product drain line.
